Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO200800079 Review Comments Bond Estimate 2009-02-05 (3)
BOND ESTIMATE - EROSION CONTROL Spreadsheet last revised:12 -5 -01 PROJECT NAME: Moore's Creek Waste Water Treatment Plant PROJECT NUMBER: WPO- 2008 -00079 DATE OF ESTIMATE: 02/05/09 ESTIMATE BY: PBC BASED ON: Sheets signed 1 -19 -09 WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 12 1500 18000 SILT FENCE LF 8280 5 41400 DIVERSION DIKE LF 690 3 2070 TEMPORARY SLOPE DRAIN LF 0 20 0 SEDIMENT TRAP 1 ACRES 2.8 1000 2800 CE SEDIMENT TRAP ACRES 0.1 1000 100 INLET PROTECTION EA 36 200 7200 EC -2 & 3 DITCH PROTECTION LF 0 10 0 PAVED CONSTRUCTION ENTRANCE EA 6 2000 12000 SUBTOTAL 83570.00 CONTINGENCY & ADMINISTRATION LS 25% 20892.50 TOTAL 104462.50 BOND AMOUNT REQUIRED 104500.00