Loading...
HomeMy WebLinkAboutSDP200800175 Review Comments Preliminary Site Plan 2009-03-06 (3)vIRG1N� County of Albemarle Department of Community Development Memorandum To: Summer Frederick, Planner From: Amy Pflaum, Engineering Review Division: Current Development Date: February 5, 2009 REV 1: March 6, 2009 Subject: SDP200800175, St. David's Anglican Church - Preliminary & Waiver Requests The preliminary site plan and accompanying waivers for St. David's Anglican Church, resubmitted on March 6, 2009, has been reviewed. Current Development Engineering's Preliminary Site Plan SRC comments have been addressed. Engineering has the following comments on the waiver requests: Surface waiver comments Please revise the waiver request to reflect the revised number of proposed parking spaces (has increased from 13 to 20 on latest plan). REV 1: Surface waiver has been granted by the Zoning Administrator. 2. Please calculate and submit the design ADT for the entrance and parking lot, and the required pavement section based on that ADT, using VDOT pavement design guidelines. [18- 4.12.15.a] REV 1: Surface waiver has been granted by the Zoning Administrator. Curb waiver comments 3. The grading of the proposed grass -lined Swale does not appear to allow for a 1 -foot depth as the cross section shows. Please provide spot elevations along the centerline and edges of the channel to demonstrate the actual depth provided. Also, the Swale's drainage area and flow calculation have not been revised to reflect the increase in the size of the parking lot. If the Swale can not properly convey the flow from the parking lot to the bio- filter, curb and gutter will better serve this purpose. REV 1: Comment has been addressed. Engineering recommends approval of the waiver of curbing. 4. Should the waiver of curb and gutter be approved, bumper blocks will be required on all parking spaces. [18- 4.12.16.e] REV 1: Comment has not been addressed. Zoning Administrator requires bumper blocks on all parking spaces that receive the waiver of curbing. Stormwater Management Comments (for information purposes only) 5. Although not reviewed at this time, the sizing calculation for the bio- filter has not been revised to reflect the increase in the size of the parking lot. [All stormwater management calculations and design will be reviewed once a WPO application has been submitted. Engineering approval of the Preliminary Site Plan does not include approval of the proposed stormwater management plan.] \\ Cob- dts01 \cityviewlnk\Docs \2008 \SDP \SDP200800175 Saint Davids Anglican Church - Prelitn\E3_psp,wvs_ADP_08 -00175 StDavids.doc