HomeMy WebLinkAboutSDP200800175 Review Comments Preliminary Site Plan 2009-02-24SDP - 2008 -175 St. David's Anglican Church - Preliminary
Summer Frederick
From: Denunzio, Joel D., P.E. [ Joel .Denunzio @VDOT.virginia.gov]
Sent: Tuesday, February 24, 2009 11:30 AM
To: Summer Frederick
Cc: Amy Pflaum
Subject: SDP - 2008 -175 St. David's Anglican Church - Preliminary
Summer,
I have reviewed the above site plan and the revisions and have one comment:
Page 1 of 1
• The entrance needs to be the same type and depth of pavement as the roadway, route 1001, which is a hard
surfaced road. This pavement design needs to at least be constructed to the ROW line but it is recommended that it be
extended at least 25 feet from the edge of the existing pavement.
If you have any questions, please let me know.
Thanks
Joel
Joel DeNunzio, P.E.
Staff Engineer
434 - 293 -0011 Ext. 120
joel.denunzio @vdot.virginia.gov
3/6/2009