Loading...
HomeMy WebLinkAboutCLE200900019 Review Comments Zoning Clearance 2009-02-11COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 February 11, 2009 Tucker Hurt Virginia Land Company 195 Riverbend Drive Charlottesville, VA 22911 Re: Zoning Clearance for Rivanna Quarry (CLE 2009 -19) Dear Mr. Hurt, The purpose of this letter is to summarize the conditions that must be met before the permit can be issued for this use. In accordance with Section 30.4.03 of the Zoning Ordinance, this use may not lawfully begin until a permit has been issued by the Zoning Administrator. For our administrative purposes, we are listing this permit as a zoning clearance and it is CLE #2009 -19. The relevant zoning regulations to this permit requirement follows: 30.4.03 PERMIT REQUIRED Prior to commencing any natural resource extraction activity within any NR district, the operator of such activity shall obtain a permit therefor from the zoning administrator. Such permit shall be issued upon filing with the zoning administrator of a plan of the proposed natural resource extractive activity, including all data sufficient to ensure compliance with the provisions of this section. The applicant may comply herewith by the filing of a copy of any plan of such proposed operation approved by the Virginia Department of Conservation and Economic Development filed pursuant to Title 45.1 of the Code, together with such additional data as the zoning administrator may require to ensure compliance with this section. In addition, the applicant shall provide evidence satisfactory to the zoning administrator that he has complied with the provisions of Title 45.1 of the Code. Every such permit issued by the zoning administrator shall be subject to annual review and shall be revoked in the event that any permit issued for any such operation shall expire or otherwise terminate in accordance with the requirements of Title 45.1 of the Code or the regulations of the Virginia Department of Conservation and Economic Development. (Amended 4- 28 -82) A site plan is not required for this use to commence because it is exempt from that requirement per Section 32.2.1 e. The Virginia Department of Transportation's letter dated June 16, 2008 states that the existing entrance serving this use is already adequate. In addition, sufficient parking currently exists on the Stackhouse property. Therefore additional parking is not required by the Ordinance. Page 2 Letter to Tucker Hurt re: Rivanna Quarry February 11, 2009 The permit to allow the quarry use will not be issued until the following conditions have been met: 1. County Engineer approval of a certified engineer's report confirming compliance with the applicable performance standards; 2. Albemarle County Fire / Rescue approval of / permit for the temporary storage of explosives onsite: 3. Federal Bureau of Alcohol, Tobacco and Firearms approval of / permit for the temporary storage of explosives onsite; 4. Submit a quarry plan revised as follows: a. Delete "quarry use" reference for parcel 59A1 and road extension to that property; b. Delete "quarry use" reference for parcel 70; C. Note the old southern entrance is not approved for quarry use; d. Clarify with notes on the plan what the "existing screening berm and dense vegetation" consists of; e. (Section 30.4.06 Yard and Bldg Locations) - show any dwellings on adjoining property within 200 ft of this property line. Your plan proposes a 200 ft buffer from the property line for this use. How will it be tied down on the ground? f. Note that 35 parking spaces will be made available on TM 45, parcel 58 to serve this use; g. Note on plan that this use is subject to the requirements of Section 30.4 Natural Resource Overlay District; h. (Section 30.4.07 Fencing) Clarify the height of fencing as well as what is proposed versus existing; i. Clarify which if any road surfaces are not yet complete per Section 30.4.11.2; 5. Any items which are not yet complete (such as screening, fencing or required road surface and the like) must be completed. With regards to items #2 and 3, please provide a copy for our file of those permits or written exemptions from the permit requirement. For item #4, please submit a revised plan addressing items a -i. Please provide information relating to #5. We will conduct a site inspection to confirm the required items are complete. If you have any questions, please do not hesitate to contact me. Sincerely, Amelia G. McCulley, A.I.C.P. Zoning Administrator