HomeMy WebLinkAboutSDP200800169 Review Comments Final Site Plan and Comps. 2009-02-12pF AL
G.
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4012
February 12, 2009
Kathryn M. Carmichael
Williams Mullen
321 E. Main St.
Suite 400
Charlottesville, VA 22902
RE: ARB2008 -00158 Ekman (AT &T)
Tax Map 87B, Parcel 4
Dear Ms. Carmichael:
I have reviewed your revised submittal for the above - referenced project which consisted of the following:
Drawings:
Sheet T -1 Title Sheet, latest revision date 2/6/09
Sheet Iof 2 Site Plan, latest revision date 9/3/08
Sheet 2 of 2 Site Plan, latest revision date 9/3/08
Sheet A -OA Area Plan, latest revision date 12/15/08
Sheet A -0 Site Plan, latest revision date 12/29/08
Sheet A -1 Compound Plan and Elevation, latest revision date 2/6/09
Sheet A -2 Equipment Layout, latest revision date 12/16/08
Sheet A -3 Foundation Details & Equipment Specs, latest revision date 10/29/08
Sheet A -4 Equipment Specs, latest revision date 10/29/08
Sheet A -5 Equipment Specs, latest revision date 10/29/08
Sheet A -6 Details, latest revision date 10/29/08
Sheet A -7 Sight Distance Analysis, latest revision date 12/29/08
Sheet A -8 Sight Distance Analysis, latest revision date 12/29/08
Sheet E &S 1 Erosion & Sediment Control Details, latest revision date 10/29/08
Sheet E &S 2 Erosion & Sediment Control Notes, latest revision date 10/29/08
The revisions included in this latest submission address all outstanding conditions of ARB approval. You may
consider this letter your Certificate of Appropriateness.
This approval is predicated on the fact that the design and materials, as proposed and exhibited for review,
will be used. This application is approved with the condition that mechanical equipment shall not be
visible from the Entrance Corridor. The acceptance of approval implies that the applicant has agreed to
execute the design as indicated on the site plan, attachments, materials, samples, and other submittal items
presented. Any change in the approved design or materials will require an amendment to the plan and
must be reviewed and approved by the Architectural Review Board.
If you have any questions, please do not hesitate to contact me.
Sincerely,
Brent W. Nelson
Landscape Planner
cc: Megan Yaniglos, (via email)
Senior Planner
Albemarle County
Valerie Long (via email)
Williams Mullen
ARB File