Loading...
HomeMy WebLinkAboutSDP200900009 Review Comments Preliminary Site Plan 2009-03-02COUNTY OF ALBEMARLE Department of Planning & Community Development 401 McIntire Road, Room 218 Charlottesville, Virginia 22902 -4596 (434) 296 - 5823 Fax (434) 972 - 4035 10V I DID% [I17:1 111005 TO: Gerald Gatobu, Principal Planner FROM: Judy Wiegand, Senior Planner SUBJ: SDP200900009, Rio Road Apartment Complex DATE: February 24, 2009 Here are my comments on this preliminary site plan: 1. This preliminary site plan shows extensive use of retaining walls. The two walls between the parking lot and the biofilter on the west side of the site are clearly labeled on Sheet 4 as being four (4) feet high. However, the height of the wall that runs along the east side of the parking lot on the east side of the site is not indicated, nor is the height of the wall at the turnaround at the southern end of this parking lot. Please indicate the heights. Staff is concerned about the appearance of the site from the apartment complex to the east. 2. The clubhouse, pool, and recreation area are located at the southern end of the site. Residents of buildings at the northern end will have quite a walk to reach these facilities. There are only eight (8) parking spaces located near these facilities and there are no continuous sidewalks shown on the site plan. There should be a network of continuous sidewalks throughout this complex in order to encourage walking to and from buildings and facilities; residents and visitors should not have to drive everywhere. Stretches of sidewalk are shown along the edges of parking lots and in front of buildings, but no pedestrian facilities marked in those areas where walkers will have to cross parking lots, internal streets, or grassy areas. Crosswalks, at least, need to be indicated on the site plan. 3. It is not clear from the site plan where the "10' gravel access road" turns into the "proposed 8 -foot mulched trailway." Will the gravel access road be used only for construction or is it permanent?