Loading...
HomeMy WebLinkAboutSDP200900006 Review Comments Preliminary Site Plan 2009-02-17 (3)II COMMONWEALTH of VIRC NIA DEPARTMENT OF TRANSPORTATION CHARLOTTESVILLE RESIDENCY OFFICE 701 VDOT WAY CHARLOTTESVILLE, VA 22911 DAVID S. EKERN, P.E. COMMISSIONER February 17, 2009 Mr. Glenn Brooks Department of Engineering and Development 401 McIntire Rd. Charlottesville, VA 22902 Subject: Site Review Meeting Comments February 19th, 2009 site review meeting Dear Mr. Brooks: Below are VDOT's comments on the Site Plans for the February 19"', 2009 Site Review Committee Meeting: SDP - 2009 -00012 Comfort Suites Inn at Hollvmead TC- Preliminary (Gerald Gatobu) • It needs to be verified that the entrance off Route 29 that is proposed to be extended into the site was intended to carry hotel traffic to the hotel and other sites in this corner. • The median cut and entrance off Timberwood Blvd. needs to be properly channelized in both the median and the entrance to allow only right in right outs for the entrance and left ins from Route 29 traffic. Also, the median needs to be channelized to dissuade traffic from attempting to take a left into the CVS site. All proposed entrances from state routes or proposed state routes need to be designed in accordance with the Minimum Standards of Entrances to State Highways. Profiles will need to be shown on the final site plan. SUB - 2009 -00012 Natterer Lots(Berkmar Crossing) Final (Elizabeth Marotta) • No Comments SUB - 2009 -00013 Gillespie Development - Preliminary (Elizabeth Marotta) • The front ditch width on the typical section should be 4 feet instead of 3 feet. Please request the applicants provide a written description of revisions with re- submissions. If you have any questions or comments, please contact me prior to sharing these comments with the applicants. Sincerely, Joel DeNunzio, P.E. Staff Engineer VDOT Charlottesville Residency 434 - 293 -0011 WE KEEP VIRGINIA MOVING