Loading...
HomeMy WebLinkAboutWPO200800107 Review Comments Erosion Control Plan 2009-02-25�'IRGINZ� COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax(434)972-4126 Project: WPO- 2008 - 00107, Barn Site Lugas Property Plan preparer: Mr. Jack Lugus jacklugus @embarqmail.com Owner or rep.: Mr. Jack Lugus Date received: 12 Dec 2008 REV 1: 24 February 2009 Date of Comment: 22 Jan 2009 REV 1: 25 February 2009 Engineer: Amy Pflaum A. General Review Comments It appears that this construction is very near, or possibly in, an existing stream buffer. Disturbance within a stream buffer (including earthwork, tree removal, addition of structures) may only be authorized by the County Engineer under Section 17 -321 of the Water Protection Ordinance. If development is anticipated within the stream buffer, please submit an application for Request to Develop in a Stream Buffer to the Community Development Department. If development in the stream buffer is authorized, mitigation will be required. REV 1: New measurements submitted by the applicant show that the potential stream buffer disturbance occurred in an area of a power line easement. Tree plantings for mitigation are not allowed in such an easement and are therefore not required. The area has been stabilized and reseeded. B. ESC Plan Review Comments 1. The Erosion & Sediment Control Plan can not be approved until the matter of stream buffer disturbance is resolved. REV 1: See above. 2. Please provide the Erosion & Sediment Control Plan (E &SC Plan) at a measurable scale. REV 1: A new plan with dimensions has been submitted. 3. Please add existing topography and existing stream buffers to the E &SC Plan. These features can be found on the County GIS website. REV 1: A new plan with dimensions has been submitted. 4. Please add the limits of disturbance to the E &SC Plan. REV 1: A new plan with dimensions has been submitted. 5. A construction entrance (per Standard & Specification 3.02 of the Virginia Erosion & Sediment Control Handbook) is required on the existing driveway. REV 1: Site is stabilized and no further construction is to take place, a construction entrance is not required. The Erosion & Sediment Control Plan (WP0200800107) has received Engineering Review and meets Albemarle County minimum checklist items for approval. The applicant must post a bond to ensure that the site remains properly stabilized until permanent vegetation has matured. The E &SC bond amount is $500.00. The forms and instructions to post the Water Protection Ordinance Bond can be found on the Community Development Department Web site on www.albemarle.org. You may contact Pam Shifflett (Albemarle County Department of Community Development) at ext. 3246 for further information on bonding procedures and Maintenance Agreements. Once the E &SC bond has been posted, you may contact the County Erosion & Sediment Control Inspector to close -out the violation. \\ Cob- dts01\ CityViewLnk \Docs\2008 \WPO \WPO200800107 Barn Site\E2_esc_ADP_08 -107 Barn Site.doc