Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO200800107 Review Comments Bond Estimate 2009-02-25
BOND ESTIMATE - EROSION CONTROL Spreadsheet last revised:12 -5 -01 PROJECT NAME: Barn Site - Lugas Property PROJECT NUMBER: WPO200800107 DATE OF ESTIMATE: 01/22/09 ESTIMATE BY: ADP BASED ON: WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 0.25 1500 375 SILT FENCE LF 0 5 0 SAFETY FENCE LF 0 3 0 TEMPORARY FILL DIVERSION LF 0 3 0 DIVERSION DIKE LF 0 3 0 TEMPORARY SLOPE DRAIN LF 0 20 0 SEDIMENT TRAP 1 ACRES 0 1000 0 SEDIMENT BASIN 1 ACRES 0 1000 0 CULVERT INLET PROTECTION EA 0 500 0 INLET PROTECTION EA 0 200 0 OUTLET PROTECTION EA 0 200 0 EC -2 & 3 DITCH PROTECTION LF 0 10 0 RIP -RAP LF 0 55 0 CHECK DAMS SQ.YD. 0 30 0 STREAM CROSSING TYPE I EA 0 1000 0 STREAM CROSSING TYPE II EA 0 3000 0 STREAM CROSSING TYPE III EA 0 5000 0 PAVED CONSTRUCTION ENTRANCE EA 0 2000 0 SUBTOTAL 375.00 CONTINGENCY & ADMINISTRATION LS 25% 93.75 TOTAL 468.75 BOND AMOUNT REQUIRED 500.00