Loading...
HomeMy WebLinkAboutSP200800058 Review Comments Special Use Permit 2009-03-10�� OF ALg� .1 �IRGINI�r.. County of Albemarle Department of Community Development Memorandum To: Joan McDowell, Principal Planner for Rural Areas From: Amelia McCulley, Zoning Administrator Division: Zoning Date: March 10, 2009 Subject: S.P. 2008 -58 Harris Garage Amendment — comments on revision These comments are provided for the revised plan dated February 15, 2009. Please consider the following comments: 1. The current plan does not address screening along the side property line between this property and TM 8, Parcel 39131 Lawson. 2. (My comment from comments on December 12, 2008): The plan does not indicate the location of the existing septic field and it should. Is it in the area of the fill? If so, Health Department review should be obtained. 3. Please indicate the dimensions of the building. An approximate square footage may be problematic. 4. Revise the plan to show the orange structure on the side of the building. 5. The applicant is advised that any vehicle chassis in their personal parking is considered an inoperative vehicle. A maximum of two are allowed and they must be covered / shielded from public view. Please be certain that the special use permit conditions include: 1. Revision to condition #13 that is clear about numbers of business vehicles; 2. New condition which requires certain remediation work to be done promptly and allows for a bond to be held for 5 years as suggested by County Engineer. The reason for this is twofold: a) instead of allowing the full two year time period for a special use permit since there are current violations that are being addressed, we will want remediation work (such as treatment of critical slopes and replanting in the stream buffer) to be done as soon as possible; and b) because the Ordinance only allows us to hold a site bond for one year, extending it to 5 years for the replanting can be done by the Board as part of the special permit approval. 3. Include a condition which clearly states what is approved. For example, a certain number of bays and /or size of building.