To: Megan Yaniglos, Current Development Project Planner
From: Phil Custer, Current Development engineering review
Date: 13 March 2009
Subject: Pounding Branch Phase I1 Preliminary Plat (SUB- 2009 - 00022)
The preliminary plat for Pounding Branch Phase H has been reviewed. This application is a rereview of a
preliminary plat that was approved in January of 2008 that has since expired (SUB- 2007 - 00120).
1. This plan appears match the approved preliminary plat (SUB- 2007 - 00120) except a few minor
changes in the area of Pounding Branch Lane. The road was shortened at least 200ft. The
previously approved plan had 5 lots off of Pounding Branch Lane, but this latest submittal has
only 3 lots and a portion of the preservation lot. Otherwise, the plan appears to match the
approved plan from last year.
2. Critical slopes are disturbed with this road alignment. A waiver of this disturbance is necessary
unless the disturbance is considered exempt under section 18- 4.2.6c by the agent. There appear to
be alternatives to the disturbance. For instance, the road alignment on sheet S6 has less critical
slope disturbance for the road than the alignment on S3. And, with more modifications to the
roadway, no critical slope disturbance appears to be possible.
3. Removal rate calculations for this project have not been submitted with this application. However.
engineering has reviewed a full WPO plan (WPO- 2008 - 00103) and is confident the current
alignment does not prohibit the applicant to provide the county's minimum Stormwater
Management requirements. We ask that the applicant show the locations of the stormwater
management facilities requested in the last WPO plan review to be shown on this preliminary plat
and the removal rate calculations included with this submittal.
4. The cover sheet states that the topography shown is from the county's loft contour intervals. In
the summer of 2008, county topography was updated to 4ft contour intervals for the entire county.
Please use the latest version of county topography or the aerial survey that was used to design the
ESC, SWM, and road plans. [14- 302.A.12]
5. The slope of the ditches in the road section should be 3:1.
6. Engineering analysis of the waiver of 14 -404 will appear in a separate document.
7. The by -right plan shown on sheets S6 and S7 does not actually appear to be completely by -right.
The plan would require a critical slope waiver from the Planning Commission. Also, under 17-
320D.6, this property would only be allowed 1 stream crossing and two are shown in the by -right
plan. An exemption of the 1 stream crossing per parcel is possible by ordinance, but it is unlikely
that the situation proposed by the applicant would meet the criteria set out in the ordinance. [17-
320D.6, 17- 321.41 Please adjust the by -right plan so that one crossing for the parcel is shown or
write a request to the County Engineer for a second crossing. Otherwise, the staff report will
acknowledge that the by -right layout would require a variance /waiver from the County Engineer
for a second crossing.