Loading...
HomeMy WebLinkAboutWPO200800065 Review Comments Bond Estimate 2009-03-09BOND ESTIMATE - EROSION CONTROL Spreadsheet last revised: 12-5-01 PROJECT NAME: MONTESORRI COMMUNITY SCHOOL PROJECT NUMBER: WPO200800065 (SDP200800098) DATE OF ESTIMATE: 03/09/09 ESTIMATE BY: JPD BASED ON: WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 1.41 $1,500.00 $2,115.00 SILT FENCE LF 855 $5.00 $4,275.00 SAFETY FENCE LF 0 $3.00 $0.00 TREE PROTECTION LF 344 $5.00 $1,720.00 TEMPORARY FILL DIVERSION LF 145 $3.00 $435.00 DIVERSION DIKE LF 0 $3.00 $0.00 TEMPORARY SLOPE DRAIN LF 0 $20.00 $0.00 SEDIMENT TRAP 1 ACRES 0.35 $1,000.00 $350.00 SEDIMENT BASIN 1 ACRES 0 $1,000.00 $0.00 CULVERT INLET PROTECTION EA 1 $500.00 $500.00 INLET PROTECTION EA 3 $200.00 $600.00 OUTLET PROTECTION EA 1 $200.00 $200.00 EC -2 & 3 DITCH PROTECTION LF 225 $10.00 $2,250.00 RIP -RAP LF 0 $55.00 $0.00 CHECK DAMS SQ.YD. 0 $30.00 $0.00 STREAM CROSSING TYPE I EA 0 $1,000.00 $0.00 STREAM CROSSING TYPE II EA 0 $3,000.00 $0.00 STREAM CROSSING TYPE III EA 0 $5,000.00 $0.00 PAVED CONSTRUCTION ENTRANCE EA 1 $2,000.00 $2,000.00 SUBTOTAL 14445.00 CONTINGENCY & ADMINISTRATION LS 25% 3611.25 TOTAL 18056.25 BOND AMOUNT REQUIRED 18100.00