Loading...
HomeMy WebLinkAboutSDP200800041 Review Comments Preliminary Site Plan 2009-04-24• R � COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia .22902 -4596 Phone (434) .296 -5832 Fax (434) 972 -4126 April 24, 2009 Richard Spurzem Neighborhood Properties P.O Drawer R Charlottesville, VA 22903 RE: SDP 2008 -00041 North Pointe [Northwest Residential Area] Preliminary Site Plan Dear Sir: Thank you for your March 9g', 2009 submittal of the above mentioned preliminary site plan, which is hereby approved subject to the conditions outlined below. I have.received comments from various reviewers relative to this proposal and this letter offers several comments which are technical in nature, and identify several major areas of importance that will need to be worked out during the final site plan stage. The major issues are: proffered road improvements, layout and design of stormwater management facilities especially Stormwater Management Facility #10 shown on the Application Plan and encroachment into conservation and flood plain areas during construction. These issues are discussed in the Comments section of this letter. Conditions of Preliminary-Site Plan Approval Approval The final site plan must comply with all requirements of the Albemarle County Zoning Ordinance and other applicable regulations and must comply with the proffers accepted and the Application Plan approved for Zoning Map Amendment 2000 -009 and the conditions imposed for Special Use Permit 2002 -072. In addition: ,Current Development: Preliminary site plan requirements that need to be addressed on the final site plan are as follows: a• [32:71.8] Sidewalks: Provision shall be made for sidewalks and pedestrian walkways which will enable pedestrians to walk safely and conveniently between buildings on the site and from the site to adjacent property. The sidewalks along Northwest Passage end before they get to U.S. Route 29. Sidewalks must extend to U.S. Route 29. Additionally, please provide a network of sidewalks that will enable pedestrians to walk safely and conveniently between buildings on the site and from the site to the proposed trails and adjacent properties. Provision shall be made where appropriate for pedestrian walkways in relation to private and public areas of recreation and open space such as schools, parks, gardens and areas of similar nature. ;• [32.5.6.i] Existing and proposed streets, access easements, alley easements and rights -of- way, and travelways, together with street names, state route numbers, right -of -way lines and widths, centerline radii, and pavement widths. Please show the existing private access easement to the Korean Church. =• [32.5.6.r] Setbacks shown on the preliminary site plan by the trail are incorrect. Please make sure the 10 foot rear setback and the 6 foot setbacks are shown correctly. Additionally, some buildings shown on the preliminary site plan are in the 8 foot front setback. Please revise. is Please provide written certification from a licensed surveyor or engineer confirming that the conservation line shown on the application plan for Zoning Map Amendment 2000 -009 -and the conservation line shown on this site plan are in the exact same location. Variation Requests: See the letter from V. Wayne Cilimberg, Director of Planning, dated April 22, 2009. - Comments Layout and design: The layout and design of this site is of major concern. The Director of Community Development has expressed concern, and has proposed phasing. His comment is as follows: • I did not note any indication of phasing the project (18- 32.5.6.c.). That said, I remember specifically discussing this at time of rezoning and noting I did not see how this property could be developed without phasing. While I cannot speak to how a future phasing plan might require a revised preliminary site plan, if there is interest in phasing the project to address the erosion and sediment control requirements, the applicant should discuss concepts with engineering staff as early as possible. Once again, I caution this is a very difficult site. Stormwater Management: County Engineering Staff and the Director of Community Development have concerns with the stormwater management facilities shown on the preliminary site plan. The design and layout of Stormwater Management Facility #10 on the Application Plan needs to be revised on the final site plan. The Director of Community Development had the following comments. With respect to the Stormwater Management Facility # 10 on the Application Plan, which is shown in the southeast corner of the proposed development (preliminary site plan), I note the following: a. This facility must demonstrate that it can be adequately maintained in the future. This includes assuring a dump truck can reach this facility and haul spoils away as well as assuring equipment can reach the spoils. As shown, it appears a truck does not have reasonable access to this area and the facility may be so steep and deep that other equipment cannot remove the spoils from the bottom of the facility. b. Under the proffers, the property has a high threshold for stormwater management. Prior to starting any design on this facility, the applicant is strongly encouraged to discuss design concepts with County staff. It is anticipated this requirement will prove difficult to satisfy and it is in everyone's interest to avoid an iterative plan review process. 2 c. Similar to b, the property also has a proffer for a high threshold of erosion and sediment control protection that will likely prove difficult to satisfy. Staff would prefer to avoid iterative plan reviews. while solutions are. developed.. d. Related to c, staff anticipates that the adjoining school site /park will be requested in the time frame of this development and the proffers require this site to be graded before given to the County. As such, this stormwater facility is likely to prove necessary for use with erosion and sediment control associated with that proffered grading. While there is no requirement this facility provide the necessary sediment control for that grading, I did not see how it can be otherwise addressed. I also note that if the grading is not done as specified by the approved proffers, the property of this site plan could be subject to a zoning violation as a result of that failure. Once again, it appears in everyone's best interest to work this out before submitting a final site plan. Other required stormwater facilities need to be designed as follows: • With respect to the other stormwater management or erosion and sediment control facilities required for this plan, the applicant is strongly encouraged to discuss design concepts with engineering staff prior to starting on plans. It is anticipated it will prove difficult to comply with the proffer requirements and ordinance requirements. County staff does not have the discretion to allow encroachments into the floodplain or conservation areas for these facilities or for any grading. County staff recommends that the applicant discuss concepts with engineering staff before the final site plan is submitted. Proffers: Proffers that need to be addressed relate to engineering comments on proffered road improvements, stormwater and erosion and sediment control and are taken to be a binding commitment as to what you will be constructing. Proffers that need to be satisfied are as follows: 1. Section 4.1 Flood Plain: compliance: [Action required with this preliminary site plan and future site plan submittal]. This proffer is subject to Albemarle County Engineering Review. Design guidelines in the engineering comments will help with grading and limits of disturbance that may currently encroach into the floodplain. See engineering comments above for guidance. 2. Section 4.2 Storm Water Management Plan Compliance. [Action required with this preliminary site plan and future site plan submittal]. This proffer is subject to Albemarle County Engineering Review. See engineering comment above for guidance. Design of stormwater facilities on the site must meet County Engineering standards. 3. Section 5.3.1 Internal street construction standards compliance: [Action required with this preliminary site plan and future site plan submittal]. All proffered transportation improvements must be shown on the final site plan. See engineering comments for guidance. 4. Section 5.3.1.c Phase III Road Improvements compliance. [Action required with this preliminary site plan] .Approval of a subdivision plat or site plan for any development of either the Virginia Land Trust Company (32 -22K) or the Jackson Trust Property (32 -22H) or any portion thereof triggers this proffer. See engineering comment for guidance. This proffer is triggered by the fact that this development is a site plan within the properties of the Virginia Land Trust Company (32 -22K) and the Jackson Trust Property (32 -22H). 5. Section,5.31.C.1. Northernmost Entrance (opposite Lewis and Clark Drive) on U.S. Route 29 compliance, Northwest Passage and North Pointe Boulevard: [Highly important action required with final site plan submittal] With respect to Northwest Passage and North Pointe Boulevard, it is noted that the proffers require Northwest Passage to be completed between U.S. Route 29 and North Pointe Boulevard, and for North Pointe Boulevard to be completed between Northwest Passage and Northside Drive in association with this phase of development. While the preliminary site plan has not shown this improvement, those roads must be approved and bonded for construction prior to approval of a final site plan for this property. That will include erosion and sediment control plans as well as stormwater management plans for that construction. See section i -v of Proffer 5.3. LC for all of the required Phase III road improvements. Detailed plans and computations will be required in conjunction with the final site plan. See engineering comments for guidance. Special Use Permit Conditions (SP- 2002 -072 North Pointe Residential Uses) that must be met with engineering guidance relate to. encroachment into conservation areas and are as follows: 1. Conservation areas. The conservation areas shown on the Application Plan shall remain undisturbed and shall be protected from development impacts to the satisfaction of the County's program authority for the Water Protection Ordinance (Chapter 17 of the Albemarle County Code) (the "Program Authority "); except that the pedestrian paths shown on the Application Plan may be placed in a conservation area where shown on the Application Plan. Storm drainage outfalls and other pedestrian paths may only be placed in conservation areas if the Program Authority finds that no other location is reasonably available and that the disturbance is necessary for such a proposed use. Notwithstanding the terms of this Condition 3 to the contrary, the Program Authority may approve a utility main within a conservation area, even if it is not shown on the Application Plan, and the Program Authority may approve other disturbances and/or measures as may be appropriate in the Program Authority's discretion to further protect a conservation area. Comment. It does not appear possible to build this site as shown on the preliminary site plan without encroaching on conservation and floodplain areas (for erosion and sediment control measures). County staff recommends that the applicant discuss concepts with Engineering staff before the final site plan is submitted. 2. Conservation areas with Utilities. The conservation areas with utilities shown on the Application Plan shall remain undisturbed and shall be protected from development impacts to the satisfaction of the Program Authority; except that: (4A). The streets and pedestrian paths shown on the Application Plan may be placed in a conservation area with utilities where shown on the Application Plan. Other pedestrian paths, other streets, and sanitary sewers, storm drainage outfalls, and/or stream mitigation measures may only be placed in a conservation area with utilities if the Program Authority fmds that no other location is reasonably available and the disturbance is necessary for such a proposed use. In any event, the construction, maintenance and use of the improvements shall have the minimum environmental impact on the conservation area with utilities necessary for the improvements to be established and maintained, and the long -term impacts shall be adequately mitigated. Nothing in this condition shall be construed to obviate the requirements established for stream buffers under Chapter 17 of the Albemarle County Code or shall constitute a waiver of such requirements. Comment. It does not appear possible to build this site as shown on the preliminary site plan without encroaching on conservation and floodplain areas (for erosion and sediment control measure). 4 Compliance with Entrance Corridor Overlay District regulations: This site falls within the Route 29 Entrance Corridor. Consequently, ARB review and approval are required prior to final site plan approval. ARB applications, checklists, guidelines and schedules are available on line at www.albemarle.org. Comments received from other departments and agencies are as follows: Albemarle County Service Authority: Comments from Gary Whelan (Engineer, Albemarle County Service Authority). See attached comment letter from Gary Whelan dated April 9" 2009. Rivanna Water and Sewer Authority: Comments from Justin Weiler dated 4/2/2009 (Engineer, Rivanna Water and Sewer Authority). RWSA has the following comments: 1. RWSA review of the final site plan will be required. As part of this review, test pits will be required to verify the horizontal and vertical locations of the 12" RWSA waterline. Special design notes will need to be added to the plans as deemed necessary by RWSA. 2. The RWSA waterline that is currently located in Rt. 29 may need to be relocated due to the widening of Rt. 29. Please provide RWSA with a copy of the Rt. 29 expansion plans so that we can evaluate the impacts to our waterline and coordinate the possible relocation of our waterline with VDOT. 3. If the anticipated average daily wastewater flows from this development exceeds 40,000 gallons per day then, per DEQ, a flow acceptance review is required. ACSA should submit a flow acceptance request to RWSA to initiate the review. 4. Please note that the water system that will serve the proposed development currently operates at a hydraulic grade line of approximately 805' above sea level, but in the future the system will operate at an HGL of 652' above sea level. Please use an HGL of 652' for sizing all waterlines in the development, and provide hydraulic calculations for review. Virginia Department of Transportation: Comments from Joel Denunzio dated 4/3/2009: The Charlottesville Residency Staff reviewed the above referenced Preliminary Site Plan dated 3- 09-09 and the following comments need to be addressed prior to VDOT recommending approval of the final site plan: 1. VDOT is working to assign the proper classification for the public streets in North Pointe. Based on county staff's discussion with VDOT, there is no interest is changing in either the general layout of streets or the street widths, but VDOT needs to confirm the design speed for the roads. That design speed will in turn establish minimum curve radii for roads as well as curve values for crests and sags on the road's vertical alignment. County staff is providing VDOT a copy of the approved application plan and traffic study done for the rezoning of North Pointe, which will be used for the "concept plan" required by VDOT's subdivision street regulations. VDOT indicates this information should be adequate for them to establish the road design speeds. Staff notes this is not a requirement for approving the preliminary site plan but the applicant will need VDOT to establish this road classification before submitting any public road plans. 5 2. The data included in the road plans need to meet the requirements of the above mentioned subdivision street regulations. No review of road plans can occur prior to VDOT approving the functional classification of the roads within the development.. . 3. Intersection layouts, typical sections, utility placements, geometric standards and any other design items shown in the preliminary plan may need adjustment upon review of the construction plan. All design needs to be in accordance with the VDOT Road Design Manual and Drainage Manual. 4. Plans for improvements to Route 29 should be submitted prior to any site plan approvals to avoid conflicts. Items such as intersection layout, auxiliary lanes, and utility placements on the Route 29 corridor will need to be addressed with the plans. Please contact me atyouur earliest convenience at 434 - 296 -5832 ext 3385 if you have any questions or require additional information. Sincerely, Gerald Gatobu Principal Planner Current Development Cc: Larry Davis Greg Kamptner Mark Graham Amelia McCulley Bill Fritz Wayne Cilimberg Elaine Echols PA" ffi 1113 . MWO COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 April 22, 2009 Richard Spurzem Neighborhood Investments- NP,LCC PO Drawer R Charlottesville, VA 22903 Re: Variation request dated March 9, 2009 accompanying SDP - 2008 -00041 North Pointe Preliminary Site Plan dated March 10, 2009 for North Pointe Northwest Residential Area Dear Mr. Spurzem: Thank you for your submittal of the variation request, pages 1 — 3 attached. You have requested three variations with the submitted preliminary site plan: To change the general location, number, design, layout and orientation of buildings and parking areas such that residential units are oriented parallel to Northwest Passage. To replace a section of Northwest Passage which had sidewalks and street trees on only one side of the street with sidewalks and street'trees on both sides of the street. To have buildings and parking between Northwest Passage and Stormwater Management (SWM) Facility #10. The first variation, to change the general location, number, design and orientation of buildings parallel to Northwest Passage, is approved as shown on the preliminary site plan. This approval is conditioned on planting strips being provided with street trees between the back of the curb and the sidewalk as indicated in the second variation approved below. This street section must be provided on both sides of Northwest Passage across your property where residential units abut the street. A corresponding variation, to have sidewalks and street trees on both sides of the street, is also approved. The analysis which I used for these two variations, which are approved as part of the preliminary site plan review, follows: Section 8.5.5.3 of the Zoning Ordinance allows the Director of Planning to grant minor variations to the arrangement of buildings and uses shown on the plan, provided that the major elements shown on the plan and their relationships remain the same as long as: 1) The variations are consistent with the goals and objectives of the comprehensive plan. The proposed variations for building orientation and a different street section support the Neighborhood Model for a pedestrian orientation and buildings and spaces of human scale. The proposed variations are not in conflict with the Neighborhood Model. 2) The variations do not increase the approved development density or intensity of development. The variations would allow for more building coverage on the property; however, the variation would not increase the approved density or intensity of the development. 3) The variations do not adversely affect the timing and phasing of development of any other development in the zoning district. The variation will not adversely affect the timing and phasing of development or any other development in the zoning district. 4) The variations do not require a special use permit. The variations do not require a special use permit. 5) The variations are in general accord with the purpose and intent of the approved rezoning application. This variation is in conformity with the approved rezoning which, in part, was intended to support the principles of the Neighborhood Model. The third variation requested, to have buildings and parking between Northwest Passage and SWM Facility # 10, will have to be considered in conjunction with the review of the final site plan. Based on comments by the Director of Community Development, there is a strong likelihood that appropriate design for erosion control, stormwater management and safety is not possible with the design shown on the preliminary site plan. While I note that you have shown slope reconstruction yielding 3:1 slopes on the site plan, according to the Director of Community Development, it is extremely unlikely that SWM Facility # 10 can function as shown on the preliminary site plan. (See comments from Director of Community Development.) I recommend that you discuss concepts with Engineering staff before the final site plan is submitted. In addition, as I said in my letter of January 30, 2009, the site plan needs to demonstrate appropriate design for the appearance from the Entrance Corridor (U.S. 29). Visual depictions would be suitable for this purpose. Because the Director of Community Development can approve the preliminary site plan contingent upon the appropriate demonstrations of stormwater management, consideration of your requested variation related to SWM Facility #10 can be deferred to the final site plan. Please feel free to contact me if you have questions or need more information. Sincerely, - V. Wayne ilimberg Director o Planning Cc: Larry Davis Mark Graham Elaine Echols Amelia McCulley Gerald Gatobu 2 Albemarle County Service Authority seMng6c«wmng TO: Gerald Gatobu FROM: Gary Whelan, Civil Engineer DATE: April 9, 2009 RE: Site Plan Technical Review for: North Pointe Northwest Residential Area SDP200800041 TM 32 -22K & 22H The below checked items apply to this site. X 1. This site plan is within the Authority's jurisdictional area for: X A. Water and sewer B. Water only C. Water only to existing structure D. Limited service X 2. A 12 inch water line is located approximately 50' distant. X 3. Fire flow from, nearest public hydrant, located 300' distant from this site plan, is 3,000 Gpm + at 20 psi residual. X 4. An 8 inch sewer line is located approximately 300' distant. 5. An Industrial Waste Ordinance survey form must be completed. X 6. No improvements or obstructions shall be placed within existing or future easements. 7. and plans are currently under review. 8. and plans have been received and approved. 9. No plans are required. X 10. Final water and sewer plans are required for our review and approval prior to granting tentative approval. 11. Final site plan may /may not be signed. X 12. RWSA approval for water and /or sewer connections. 13. City of Charlottesville approval for sewer. Comments: Show connection to North Pointe Regional Pump Station. Projected flow of 50,220 gpd will require RWSA capacity certification. The site plan does not show or incorrectly shows: meter locations water line size waterline locations sewer line size sewer line locations expected wastewater flows easements expected water demands 168 Spotnap Road - Charlottesville • VA 22911 - Tel (434) 977 -4511 - Fax (434) 979 -0698 www.serviceauthoriy.org