Loading...
HomeMy WebLinkAboutSDP200800040 Review Comments Preliminary Site Plan 2009-03-09SDP - 2008 -00040 Final TouchFrom: Denunzio, Joel D., P.E. [ Joel .Denunzio @VDOT.virginia.gov] Sent: Monday, March 09, 2009 1:38 PM To: Summer Frederick Cc: Amy Pflaum Subject: SDP - 2008 -00040 Final Touch SDP - 2008 -00040 Final Touch Summer, I received a copy of the above site plan directly from DDR and have the following comments: Previous comments have been addressed. The proposed ROW line falls outside of the back of the curb but in the middle of the sidewalk. VDOT prefers that the ROW be placed 1 foot outside of the sidewalk. If this is not possible due to the setback requirements of the existing structure, the sidewalk will need a maintenance agreement, permit and bond with VDOT. If you have any questions, please let me know. Thanks Joel Joel DeNunzio, P.E. Staff Engineer 434 - 293 -0011 Ext. 120 joel.denunzio @vdot.virginia.gov