HomeMy WebLinkAboutSDP200700116 Review Comments Final Site Plan and Comps. 2009-04-09OF Al,
'P
vIRGIN��
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project:
Hunters Hall Final Site Plan [SDP200700116, WP02007000861
Plan preparer:
Justin Shimp, Dominion Development Resources [jshimp @ddrva.com]
Owner or rep.:
RL Beyer Construction, Paul Beyer [beyer @beyerhomes.com]
Plan received date:
18 Aug 2008
Rev 1:
15 Jan 2009
Rev 2:
12 Mar 2009 (and email 2 Apr 2009)
Date of comments:
3 Oct 2008
Rev 1:
27 Feb 2009
Rev 2:
9 Apr 2009
Reviewer:
Amy Pflaum, Current Development Engineering
The Erosion & Sediment Control and Stormwater Management Plans (WP0200700086)
submitted 12 March 2009 have received Engineering Review and meet Albemarle County
minimum checklist items for approval. Please revise the limits of disturbance to reflect the
new well location and submit 5 paper copies of the Plan to Current Development
Engineering.
The E &SC bond amount is $24,400. The SWM bond amount is $27,500. The forms
and instructions to post the Water Protection Ordinance Bond can be found on
the Community Development Department Web site on www.albemarle.org.
A completed Standard Stormwater ManagementBMP Facilities Maintenance Agreement for
TMP 78 -49D must be submitted, approved, and recorded prior to final approval [17- 304E]. The
forms and instructions can be found on the Community Development Department Web site on
www.albemarle.org.
You may contact Pam Shifflett (Albemarle County Department of Community Development) at
ext. 3246 for further information on bonding procedures and Maintenance Agreements.
Once the E &SC bond and the SWM bond have been posted, you may contact the Department of
Community Development to arrange a pre - construction meeting with a County Erosion &
Sediment Control Inspector. Should the County Inspector find the limits of disturbance increased
or the need for additional control measures required to protect the site, additional fees will be
required.
Current Development Engineering review is completed on the Final Site Plan
(SDP200700116) and I have notified the project's lead planner, Patrick Lawrence, that all
previous engineering comments have been satisfied. Once all other County departments have
completed their reviews of the Plan, Patrick Lawrence will contact you to request final copies of
the Plan be submitted to Current Development for signature.
Please contact Patrick Lawrence of Current Development Planning at ext. 3297 regarding
approval of the Final Site Plan.
\ \Cob- dts01 \cityviewlnk\Docs\2007 Applications\2007 WPOs \WP0200700086 Hunter's Hall ESC & SWM
Plans\ E5 _fsp,esc,swm_ADP_07_116_Hunters Hall.doc