HomeMy WebLinkAboutSDP200800174 Review Comments Preliminary Site Plan 2009-02-20•
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
February 19, 2009
Scott Collins
Collins Engineering
800 E. Jefferson Street
Charlottesville, VA 22902
RE: Old Trail Village, Blocks 1 & 2 Shared Parking Analysis
Dear Mr. Collins:
You have provided a parking analysis that supports the provision of 454 parking spaces
to serve Blocks 1 & 2 in Old Trail Village. Proposed Block 1 uses include 78 residential
units, 20,898 square feet of gross leasable area of restaurant/retail, 20,898 square feet
of gross leasable area for office and 7,216 square feet for an athletic facility. A facility for
the elderly is proposed for Block 2 consisting of 40 assisted living beds and 78
congregate care dwelling units and 40 employees.
I agree with the conclusion of your Parking Analysis, dated February 10, 2009, that a
shared parking arrangement utilizing 454 parking spaces to serve the proposed uses is
reasonable. This is based primarily on the difference in peak demand for parking
between the office use and the residential, restaurant/ retail & athletic facility uses
described below. I also found it to be significant that this is a reduction of 18.6% which is
considerably less than the 35% allowed by the ordinance in section 4.12.10.d. The basis
for this approval is further explained as follows:
1. The zoning ordinance requires 430 spaces for Block 1 (assuming the shopping center
standard for developments containing between 200,001 and 600,000 gross leasable
area) and 128 spaces for Block 2 based on section 4.12.6.
Block 1:
78 Dwelling Units- 156 spaces
20,898 s.f. Restaurant/ Retail- 4.5/1000 s.f. 94 spaces
20,898 s.f. Office- 1/200 net s.f. 84 spaces
7216 s.f. Athletic Facility- 1/75 s.f. 96 spaces
Total 430 spaces
Scott Collins
February 19, 2009
Page 2
Block 2:
78 Congregate Care Units -
40 Assisted living beds -
40 Employees-
Total
1 /unit
78 spaces
1/4 beds
10 spaces
1 /emp.
40 spaces
128 spaces
Total required spaces per zoning ordinance for Block 1 & 2 = 558
Total provided spaces on Blocks 1 & 2. 454
Deficit 104
Percentage of reduction 18.6%
This calculation does not include a reduction of required parking based on sharing
between staff and congregate care residential units.
2. Your analysis of the highest total parking demand, based on ULI figures, is 474
spaces required for Block 1 on weekends in December. This figure, plus 128 spaces for
Block 2, indicates a peak total demand of 602 spaces. This results in a deficit of 148
spaces. The percentage of this reduction is 24.5 %. This figure is less than the 35% limit
on shared parking and is anticipated to occur for a small percentage of the year.
Your analysis for the majority of the year, based on ULI figures indicates that Block 1 will
experience a maximum parking demand of 414 spaces and Block 2 will require 107
spaces. This results in a deficit of 67 spaces. The percentage of this reduction is 12.8 %.
3. It is recognized that the residential, restaurant/retail and athletic facility all share a
peak demand around 6 P.M. (Block 1) However, this is off set by the office use that
experiences a different peak time.
4. The pool in Block 3 is not adjacent to Blocks 1 & 2. It is not factored into this
determination. That said, it is recognized that there are future shared parking
opportunities in Block 3. In the event that parking issues become evident in Old Trail
Village later there will be an opportunity to address them in the course of future
development.
Please contact me if you have questions.
Sincerely,
John Shepherd
Manager of Zoning Administration
PARKING ANALYSIS
BLOCKS 1 AND 2
OLD TRAIL VILLAGE
February 10, 2009
COLLINS
Old Trail (pillage Blocks I & 2 Pat-king Analysis
Summary of proposed development
Block 1, located along the west side of Old Trail Drive, between the two roundabouts, is
considered the heart of the Village Center at Old Trail. This block will consist of two mixed use
buildings with commercial space on the ground floor and apartments on the second floor. While
a range of uses are allowed by the code of development for Old Trail Village, some assumptions
can be made based on anticipated market conditions and existing leased space. The following is
a breakdown of the anticipated uses for each of the buildings within block 1:
Block 1 Uses
Building 1:
• residential units
• restaurant / retail space
• office space
.• athletic facility / health club
Building 2:
• residential units
• restaurant/ retail space
• office space
Block 2 will be occupied by a retirement facility serving some residents in a congregate care
environment, while other areas will be devoted to a rest home/ nursing home/ convalescent. The
following summarizes the uses in Block 2:
Block 2 Uses
• 78 residential units devoted to a multi- family congregate care facility for the
elderly
• 40 beds devoted to rest home/ nursing home/ convalescent home
• 40 employees maximum, during a given shift to serve residents of both
components of the facility
Parking Required
The varying users within both blocks is conducive to shared parking arrangements between
users.
Block 2
Because the mix of uses in Block 2 is the least complex to analyze, this will be considered first.
Block 2 consists of two basic uses: (1)Multi- family congregate care for the elderly and (2)Rest
home/ nursing home/ convalescent home. The parking required for each of these two uses is
summarized as follows.
1. Multi- family congregate care for the elderly
Section 18- 4.12.6 of the Albemarle County Zoning Ordinance provides the following parking
requirement for multi - family congregate care for the elderly:
Page 2 of 6
Old Trail Village Blocks I & 2 Parking Analysis
tWulti- family divellings,for the elderly: One and one - quarter (1 1/4) spaces per unit plus one
(1) space per employee on the largest shift; provided that for a congregate care facility, one
(1) space per unit plus one (1) space per employee on the largest shift.
The congregate care portion of the facility generates the following parking demand:
78 congregate care units x (1 space / unit) = 78 parking spaces required for residents
40 employees on largest shift* x (1 space/ employee) = 40 parking spaces for employees*
*note that employees will serve both congregate care and assisted living residents
2. Rest home, nursing home, convalescent home
Section 18- 4.12.6 of the Albemarle County Zoning Ordinance provides the following parking
requirement for rest home, nursing home, convalescent home:
Rest home, nursing home, convalescent home: One (1) space per four (4) beds.
The convalescent home portion of the facility generates the following parking demand:
40 beds (1 space/ 4 beds) = 10 spaces required
In summary, Block 2 generates the following gross parking demand:
Use Parking Demand
Congregate Care Units 78
Convalescent Home beds 10
Employees 40
TOTAL 128
It is reasonable to allow up to 20% shared parking between residential and commercial users.
For Block 2, congregate care parking demands are generated by residents, while the parking .
needs generated by the convalescent home and employees are considered commercial uses.
Allowing up to 20% shared parking between these uses would allow for a parking reduction to
107 spaces required. Shared parking is calculated as follows:
128 —107 x 100% = 19.6% shared (under 20 %)
107
Block I
Block 1 consists of residential apartments and commercial space of varying uses. With at least 4
distinct uses under consideration, analyzing shared parking becomes more complex. To more
accurately model the parking scenario anticipated for this block, we have employed the Urban
Land Institute's (ULI) shared parking analysis methodology. This analysis establishes base
parking ratios for each use, separated between weekdays and weekends. The base parking ratios
are then adjusted based on employees /residents versus customers /visitors, months of the year and
time of day. Recommended ratios and adjustment factors are provided by ULI based on
extensive market research for individual uses.
Base parking ratios were calculated based on the ratios provided by ULI. Base parking ratios for
commercial square footage are calculated based on gross leasable area, which is summarized
below:
Page 3 of 6
Old Trail Village Blocks I d 2 Parking Analysis
Block I Uses
The base parking ratios were calculated for weekdays and weekends, and separated between
visitors/ customers and employees/ residents. See Table 1.
Tables 2 and 3 list the monthly adjustment factors per ULI. These factors were applied to the
base parking ratios, resulting in the adjusted parking values provided in tables 4 and 5. This
analysis shows the peak weekday parking demand to occur in October (45 1.6 spaces), and the
peak weekend parking demand to occur in December (474.4 spaces).
Time of day factors provided by ULI are shown in Tables 6 and 8. These factors were applied to
the peak parking values generated for weekdays in October and weekends in December, resulting
in Tables 7 and 9. The peals hour of weekday parking demand occurs at 11:00 am on weekdays
in October (386 spaces). The peak hour of weekend parking demand occurs at 12:00 noon on
weekends in December (414 spaces). Similar matrices were produced for the summer months
(June through August), resulting in a maximum parking demand of 408 spaces.
Parking provided
As currently designed, 454 parking spaces are proposed between blocks 1 and 2. These are
broken down as follows:
Parking nrovided: Blocks 1 and 2
Block #
Building 1
Building 2
Total
Residential Units
39 units
39 units
78 units
Restaurant/ Retail
8645 sf GLA
12,253 sf GLA
20,898 sf GLA
Office
8645 sf GLA
12,253 sf GLA
20,898 sf GLA
Athletic Facility
7216 sf GLA
0
7216 sf GLA
The base parking ratios were calculated for weekdays and weekends, and separated between
visitors/ customers and employees/ residents. See Table 1.
Tables 2 and 3 list the monthly adjustment factors per ULI. These factors were applied to the
base parking ratios, resulting in the adjusted parking values provided in tables 4 and 5. This
analysis shows the peak weekday parking demand to occur in October (45 1.6 spaces), and the
peak weekend parking demand to occur in December (474.4 spaces).
Time of day factors provided by ULI are shown in Tables 6 and 8. These factors were applied to
the peak parking values generated for weekdays in October and weekends in December, resulting
in Tables 7 and 9. The peals hour of weekday parking demand occurs at 11:00 am on weekdays
in October (386 spaces). The peak hour of weekend parking demand occurs at 12:00 noon on
weekends in December (414 spaces). Similar matrices were produced for the summer months
(June through August), resulting in a maximum parking demand of 408 spaces.
Parking provided
As currently designed, 454 parking spaces are proposed between blocks 1 and 2. These are
broken down as follows:
Parking nrovided: Blocks 1 and 2
Block #
Surface Spaces
Garage Spaces
On- street
Total Spaces
Spaces
1
194
12
206
2
134
78
36
248
Total spaces
328
78
48
454
provided for
Blocks 1 and 2
Block 2 requires 107 parking spaces, as calculated above. The remaining 347 spaces are
available for the users of Block 1. Based on the analysis conducted, this appears to be adequate
for the parking needs calculated, with the exception of the periods from 9am to 1 pn on
weekdays and from I Oam to 1 pm and 6pm to 7pm on weekends. The maximum additional
parking needed would be 67 spaces.
Page 4 of 6
Old Trail Village Blocks I cti 2 Parking Analysis
Other Parking Considerations
In addition to the lots and on- street parking provided for blocks 1 and 2, several additional
parking considerations should be taken into account.
Variable Modes of Transportation
Old Trail Village is designed to be pedestrian - friendly with sidewalks and street trees lining
every street. Trails and sidewalks will link neighborhoods, traffic calming measures, such as
roundabouts, have been employed to control traffic speeds, and streetscapes are oriented to the
pedestrian. While Old Trail Village is still in its infancy, a high degree of pedestrian mobility is
expected. Block 1 will be the commercial center of the development and is planned to be an
attractive pedestrian destination for thousands of surrounding residents. It is reasonable to
expect that many patrons of the businesses within block 1 will choose to walk, rather than drive,
to their destination, especially during daylight hours, when peak parking needs are the highest.
Available Parking in Pool Lot
Block 3, just to the north of Block 1, will be home of an outdoor community pool and swim club.
A parking lot and on- street parking consisting of 109 spaces has been approved for pool users.
The pool lot entrance is located less than 400 ft. from Block 1. The pool use generates a need for
only 68 parking spaces, and will only be used during the summer months (i.e. Memorial Day to
Labor Day). The remainder of the year, these spaces will be available for Block 1 parking needs.
The following summarizes the excess parking available in the pool lot:
Jan. -May & Sept. -Dec. 109 spaces available
June -Aug. 109 — 68 = 41 spaces available
Future Development
Other surrounding blocks will be developed with a mixture of uses and parking lots to
accommodate them. Parking will be available in these lots to further supplement Block 1. In
particular, the remainder of Block 3 is intended to include a parking lot to accommodate
additional development.
Analysis
Parking is provided throughout the Village Center in surface lots, on- street and in garages which
will be shared among users. Because the availability of the pool lot varies, based on the time of
year, the parking situation has been analyzed in two scenarios: (1) during the months of June -
August, when the pool will be open and in need of parking; and (2) during the remainder of the
year (September — May) when the pool will be closed and its parking lot will be available. The
following table summarizes the parking conditions in each of these two scenarios:
Page 5 of 6
Old Trail Village Blocks I & 2 Parking Analysis
Parkinfz Summary — Blocks 1, 2 and 3
Block #
June — August
September -
May
Available
Max.
Net Parking
Available
Max.
Net Parking
Parking
Parking
Parking
Parking
spaces
Demand
spaces
Demand
1
206
408
-202
206
414
-208
2
248
107
+141
248
107
+141
3 (pool)
109
68
+41
109
0
+109
TOTAL 1
563
583
-20 1
563
521
+42
During the majority of the year (September through May) adequate parking is available to
accommodate the maximum demand within Blocks 1 and 2. A surplus of at least 42 spaces is
anticipated.
During the summer months, when the pool will be in use, there may be a shortage of parking
spaces for Blocks I and 2. At the peak hour of demand, an additional 20 spaces may be needed.
This accounts for less than 4% of the total number of parking spaces in demand during the
summer months. These additional parking spaces will be accommodated via additional on- street
parking spaces which are not yet accounted for and in future parking to be provided within the
undeveloped portion of Block 3. Additionally, it is reasonable to assume that during the summer
months, pedestrian trips may replace a small percentage of vehicle trips, especially as additional
residential development occurs in the surrounding blocks at Old Trail Village. The attached
exhibit graphically depicts the parking availability described in this analysis.
In conclusion, parking demands vary for Blocks 1, 2 and 3 depending on the time of year, day of
the week and time of day. While the site plans currently approved or under review include
adequate parking spaces to handle the majority of peak parking demands, during the highest
parking demand in the summer months, up to 20 additional spaces may be needed. These will be
accommodated in the future development of Block 3, and with on- street parking that is currently
unaccounted for in the calculations. Furthermore, it is anticipated that as the Village Center
becomes more developed and residential development increases, pedestrian travel will become
more common to and from the Village Center, fiu-ther reducing the demand for parking.
Page 6 of 6
zw
6
y
.YOUt�'
PP
oi
�.�..:• \ \,�2;� /�`���f( fit. g'N\ \„ r �. � I�ri�i.� % ?* \t
iii/
0 0 i \ r�y53 \ (. / .t<. t ,
'�f 1 ` //t / " � � ' .1�. � � \,, °S!� N r; } � � �� , \n3f�'„t �/ / l 5 , <:;� ` • ,,�< t � i,`} ',\ \ \ � it
co
m *t%• �:i /- �j�( /r `',\l �: ,�x N:,` �O O ;�`'� \ ✓"r �. 'l. t, \\ 1�•`1/ 'n,� `:t, �• ` \`�t
twn "\F / / 4- \\ ` %i �' • .` ',a•' �' :u4 � \, ,-1
alto f• Ls , 1 r' tit •` , \�i
m F- C7 \ `.� \, t yr. '�` <� \'✓ ``\ ��tG `;' R' .. - " \ �'�r :, \:� \��i
Lu
O U) a U n�1` J;r , v L \ ��; o ( p (rt
co
L a>
p i
t � :.. � Pu U �` � 'I vFrJ �' r•',T\ r R :M t \' �?r��i' \ �\ \ C� \��. "`` ��ry �%
,
,
F- W 0
0 LL
Y 7 :w 7- -I O U Z mQ Cf U t� \ '• ,xi pi x
I O
J;ki ,7"I —YJW� L CO N a w �traOm V\.
r a \
IN
c1/�1
W
z
4 � 4
LO
1..l
r
Cif y Nth
k'Ik Jt�it y tit \ \ y .✓'.. .'��:.'; \ �' \\ ✓�.
Mo
f— OU \y(', /' > ?t a �5r✓� t Sd t,', \ i
\ \�MG¢m
to - c'
}i5', 0 ti ! qa_id ati ;?�^- t'.:.�5,,..jj�\ • " \ \4ir�f �+ p O n ti �1 f1 \ 44 a .
, �)
S 'E(,+� a v r''% SS l \ to �. 5 i•rF yv1 \' \ 4 . t1 r
W2wtS.''y* .L +ytrt, ` \� / {(� /r
, / / \ \ �F \� / \ 1� \ � �S<i�'A+ / y f' v✓ 1 \ Li .,
tins
�{q,��y'1^`G � `, �:�/, /.SK t� � .\ 4�' �U � 0 !a�'� .. .f!" , /, \\ \ '7�:�;/\ :••y'. ti\.� ,k,, x. .,..\ \ t•Z
' �' /' � � //r ''j s0�\:' \ \y :f��'.n, y\.�,..rtt,y'� ''/ �.:.i',;, r '`' \ \ •'. < " \�;•,y `, `,� \ \ \\ „'c`�'\
k w.+y4: f ✓ / /i' O I— C7 a\ '�l4 } .,f %'/ : •, \ . ° ” �\ ` \ '� `' ' . -1 \ 'L .r ".:n.,h ?. .� \ \ ':\
W Z (n ';��. \'a \`^.•nom'` 'i \/ iJ^.a, Q, "` \` •d :�.i 4•'.� x, \',,: y'4 '•�\''.- \ `'l �W�`. i t \ 1�` A ", \5\�\
meµ Y U \` Z \ /' „ .:.:, `r t ,\ ' .' �1;;, : aV . ` •k•;, \`>\
a �� �/��' m r- a ;r . / .:,��', +' �`; ' \ � �v • i L. , td:: -' • `�- �x'`�t ".�4:` ,.: : ;�t. �
�?�M to Q n <': •'C. L :' C( x it `;
a)"Fip��st'•�y� /, O <n ,/' ,3 r `,•' :> a t . �' ety,; ,Y \ I - ,
U
Z Z a
W
a.
n� lr l U a LL, m \� c y m\ \\ \4WY'`` \\i <:K \ \' .,� j /•'\.
;. t \ur j ., � W O � ��. VF /!! t r t�'T \ � �\ �W,,, e� ,,>La�•� . \\ `� \ \ \'4, hr� xr�� >t' '�`/
zc�opm.° 'Pt �il // ii \ \�, \ ;a\\1 \Yg •� \ \ -�r+.� �`� �� r �_;
W O
�I w� � g��I{ aQivi ?, M wo
rrZl7'•a0 d /� aaU(7mJtnv
rJ t- }lr' L' O z ? m O
m W Y �_
U \ \\\ ` .\ {{ 44yy •"'� [Yl
CO
Cn
1,
ij
m z
V
CD
LO
�� �t ,naMill r CL
z
ID
r-
N 2sLO
J O
a w
w D
0
O
U, . Lo m
ra m
iw
p O O
J a
a
H
W' N N
N x N N
w
p v a
Y
O = z
m as
U)
O
U'
Z
a
w
Q
m
w
ca
J
F-
0000
00o0
0000
00 c
°o coo o
� °o m° °o °o
�
0oo o
000o
0 0 0 0
0 0 0 0
OCl) 00 m 0o
O °o °o LO °o
Z
0000
Z
m
0 0 0 0
m o m o 0
0 0 0 0
o r o
co m00m00
°o °om °o
U
U
O
O
<
0000
0000
(
7
0 0 0
o
a 0) w o
0 0 0 0
o o rn o
a
0000
0000
rn m ° oo
0oo o
000o
mmmO
OmrO
0000
oo0o
m o m o 0
o r o
0 0 0 0
(D O N O
mo(Do
e o 0 0
N O O O
rn o r o
0 o 0 o
u) o(no
rn o m o
0 o o o
m °o m °o
o 0 0 o
(n000
w o 0 0
Za
ww
y 'nO _
N
G U D
iV J a' N w
= O u
ED Z
O t
FQ 2LL 0O¢
F-
zW
w w
0
� a
oWE
aW
} (n
w = 0
F, O
Z
O
Fa m LL
0 0 0 0
o o(n0
} O O r O
0 e 0 0
IL O 00 O0D 00
= 0 0 0 0
Uoo(no
a o o m o
m In O O O
w m o 0 0
LL r
0 0 0 0
Z(n o 00
Q m o 00
.Y
z:l U
W
(0 w
N o N N N 0 0 V)
UvNro UOcomo m
w(douio wr L6 v
Q N M ❑ 'd' '- dn'
O M M N O N
> O V) n 0 > O ci Il� O N
0I; 0m0 Or r r N
Z N M Z 't to
m fm0 r 0 O m n 0 N
NOmo rf- m
O O
rd' fMO, n o O (7 (NO O ONOro
a NOM 0 a dr r- r ry
N N N
m O 0 M o m
(� r o 1 O m v O N
�riono =3 r-: (6 v
Q N N Q r OV
N N� O O W c)I O 0N0
7N 0N0 V ID � -
� h
-� N d
(mo W O O M ci O N
c'7 o LO r N
Z N N Z a 7
Ol N W
r O o (%) M O W
M
O N O a V r to
N
a'7 (MO rO a' O C'1 O 0M')
aviono a.rr-��r ui
QN N Q f- r [p
S� m<M SN O N
U cOro Uo(h�O N
rio of o
LO N m � r V
m (mo r l 0 m ((R fn W 0 co
LO
W m 0 1h 0 W V r r M
LL N M LL V - d,
Z co (m m 0 (0 O Z (nO (`') � O O
(O
M
U
Z Z
of
Y Y
Q 6
(L a
❑ 0 Q
J
V)
❑ w O
V) V)
0Qw u. Q W 'u
Z J n c cu m J} c a Z
WyF� u H� c °) Y
J '�
Lu Z V) � v Z a ;° Q 'd � w
co
HLU 0 U w o¢ a�'' W D� o¢�
Uooroo
(„)(i cqD
n
W o cN N o
Q 00 V
W; O N n
Q m N
N
V
N n 00
m N V O
N V O
> c') n 0
m
O v (0 06
O (`'i N I�
N
Z' C
Z M r
7�
N N V O
m n O
N
o w o 0
m N )�
w v
F
mr
F .-
U
U
O
O
N N� O
LO :t w 0
(ND,
a to co 0
a M N r
m
w r m
w M n
V)
V)
(D N m m o
0 M O
V1
�(d vi m o
¢ W M
m 7 N
vi
N
M m W 0 M
N 0 O
V' O
N r
?
c,)
m w
W r to
V N m 0
u) 0
M O
r
N
co m 0 0
M N r
m
Z m
Z m r
v
N n V)
LQ ci
N O O
m o
N
v,
}Q 0 V) O
n N
N
a M
d'
r
LO
a' O N co O
ELc4(daio
a' M m 0
a 0Nr
?
w
Q' m
Q M r T
v
U co N C O
S
U M r n O
(r0
aoi(doo
CO Nr
m
O
W O
LL O V) O V
LL N r N n
m
r
�
Z E N (0. O
Z�,. W O
N
N r N r
ID
M
V
0
Z
Z
Y
Y
Q
Q
a
a
Q 0
Q
ui
J
V) V)
_
FQ-
ju
.F
OF
O a
.T,
Q
Z
U)
.m
w Q J
c m
)- }
i-
vOSO
W'�
=0
m u c
❑
J wzN
v.�
za
�° u m
w
-
w
a w0=
wL w
0�
air w
Joao
EW
ooaa
3
N o N N N 0 0 V)
UvNro UOcomo m
w(douio wr L6 v
Q N M ❑ 'd' '- dn'
O M M N O N
> O V) n 0 > O ci Il� O N
0I; 0m0 Or r r N
Z N M Z 't to
m fm0 r 0 O m n 0 N
NOmo rf- m
O O
rd' fMO, n o O (7 (NO O ONOro
a NOM 0 a dr r- r ry
N N N
m O 0 M o m
(� r o 1 O m v O N
�riono =3 r-: (6 v
Q N N Q r OV
N N� O O W c)I O 0N0
7N 0N0 V ID � -
� h
-� N d
(mo W O O M ci O N
c'7 o LO r N
Z N N Z a 7
Ol N W
r O o (%) M O W
M
O N O a V r to
N
a'7 (MO rO a' O C'1 O 0M')
aviono a.rr-��r ui
QN N Q f- r [p
S� m<M SN O N
U cOro Uo(h�O N
rio of o
LO N m � r V
m (mo r l 0 m ((R fn W 0 co
LO
W m 0 1h 0 W V r r M
LL N M LL V - d,
Z co (m m 0 (0 O Z (nO (`') � O O
(O
M
U
Z Z
of
Y Y
Q 6
(L a
❑ 0 Q
J
V)
❑ w O
V) V)
0Qw u. Q W 'u
Z J n c cu m J} c a Z
WyF� u H� c °) Y
J '�
Lu Z V) � v Z a ;° Q 'd � w
co
HLU 0 U w o¢ a�'' W D� o¢�
2 2
2 2
RO
§ : :2
5
.2; ; §: |]§ ;§
§
IN
jt2
RO
jt2
|]c;
k
L)
/!
(k \
</
/§:
§§a:/
!
RO
\\
L)
/!
(k \
</
__
eo , ,:
o.
, .§
[
\k
:;;
|2 ;;(
2
;c
!
7.10
§;
§
/
I(
\
S
•`°
-�`
§
7
`§
\
\
,
\ �
^
\
?
§`
7
(
7
f
§,_.
6N
\26
�; 2
�S G§
§ : § ;
§; ;(
k
§w
§w
>
\(
\(
)
_
;
110
.. \;
( -_
§§
( c
( '0
`-
\\\
k`k
00
\ ° \}
\)/
),j\
§§
\! /\
eeo
!§)�
r\
�§ :�
e;;
2§!!
!*
mo«