Loading...
HomeMy WebLinkAboutARB200800092 Review Comments Preliminary Site Plan 2009-01-06�� OF ALg �'JRGINZ� COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 January 6, 2009 William H. Russell Hazen and Sawyer 4011 Westchase Blvd Suite 500 Raleigh, N.C. 27607 Fax (434) 972 -4126 RE: ARB- 2008 -92: RWSA, Wastewater Treatment Plan Nutrient Removal Improvements Tax Map 78, Parcel 22A Dear Mr. Russell: I have reviewed your revised submittal for the above - referenced project which consisted of the following: Building g rawiM Sheet 1, Cover Sheet: Moore's Creek Wastewater Treatment Plant Nutrient Removal Improvements, date February 2009 Sheet 2, Photo Location Drawing, received March 16, 2009 Sheet A781 Boiler Facility, Architectural Floor Plan and Roof Plan, latest revision date 1/30/09 Sheet A782 Boiler Facility, Architectural Elevations, latest revision date 1/30/09 Sheet C 1 Site Work General, existing Site Conditions — Demolition, latest revision date 2/09 Sheet C2 Site Work Civil, Proposed Improvements, latest revision date 3/09 Sheet C 11 Site Work Civil, Partial Site Plan — Final Grading, Drainage and Erosion Control, latest revision date 3/09 Sheet C19 Site Work Civil, Partial Site Plan — Final Grading Drainage and Erosion Control, latest revision date 3/09 Sheet L1 Landscape Plan, date 1/5/09 The revisions included in this set of drawings address all outstanding conditions of ARB approval. The changes proposed in this amendment do not represent a substantial change to the original design and meet all the guidelines observed in the original approval. As a result, the original Certificate of Appropriateness will remain in effect. This Certificate of Appropriateness is predicated on the fact that the design and materials, as proposed and exhibited for review, will be used. The acceptance of approval implies that the applicant has agreed to execute the design as indicated on the site plan, attachments, materials, samples, and other submittal items presented. Any change in the approved design or materials will require an amendment to the plan and must be reviewed and approved by the Architectural Review Board. If you have any questions, please do not hesitate to contact me. Sincerely, Brent W. Nelson Landscape Planner Planning Division cc: Dean Waldrop (via email) Hazen and Sawyer Summer Frederick (via email) Senior Planner Albemarle County ARB File