Loading...
HomeMy WebLinkAboutSDP200900020 Review Comments Preliminary Site Plan 2009-04-14vIRGIN� County of Albemarle Department of Community Development Memorandum To: Summer Frederick, Senior Planner From: Amy Pflaum, Engineering Review Division: Current Development Date: April 8, 2009 Subject: SDP200900020, Tabor Presbyterian Church Addition - Preliminary Site Plan The preliminary site plan for the Tabor Presbyterian Church Addition, submitted on March 23, 2009, has been reviewed. Current Development Engineering can recommend approval once the following comments have been addressed: General Site Plan Comments 1. Please revise the Field Notes on Sheet 2 to state that this property is in the Lickinghole Creek Watershed [18- 32.5.6.fl. 2. The existing concrete sidewalk adjacent and parallel to Tabor Street should be extended to the western edge of TMP 56A2 -1 -12 with this site plan [18- 32.7.2.8]. The Downtown Crozet District zoning requires new sidewalks to be 8 -feet wide [18- 20B.7.A]. The applicant may request a waiver of the width requirement under the provision in 18- 2013.7.1), this is an administrative waiver to the Chief of Current Development. The VDOT standard for sidewalk width on an Urban Local road without curb & gutter is 4 -feet. 3. Hard surface and curbing are required on all new parking lot travelways (18- 4.12.15). Written requests providing justification for a waiver of these requirements must be submitted with this site plan [18- 32.5.3]. Please calculate and include the design ADT for the travelway, and the required pavement section based on that ADT, using VDOT pavement design guidelines. [18- 4.12.15.a] 4. Alley right -of -way or easement width should not be less than 20 feet. The Chief of Current Development may authorize an alley with a lesser width. [ 18- 32.7.2.5, 14- 410(D)] 5. One -way access aisles may be approved if a public street is not part of the circulation loop. [18- 4.12.17.c.2] It appears that vehicles will loop back onto Tabor Street to reach the existing parking lot after circulating through the one -way drop off. A waiver of this criteria may be requested under section I8- 4.12.2.c. 6. Per VDOT standards, a commercial/private entrance onto public street shall have minimum return radii of 12.5 feet and a minimum width of 14 feet for one -way traffic. 7. Please show sight distance triangles at the new entrance. Stormwater Management Comments (for information purposes only) The conceptual stormwater management plan appears adequate. Stormwater management calculations and design will be reviewed once a WPO application has been submitted. Engineering approval of the Preliminary Site Plan does not include approval of the proposed stormwater management plan. 9. The culverts under the existing entrances and the roadside ditch along Tabor Street appear to need maintenance. Calculations for the culvert and ditch capacities will be required with the WPO application. The roadside ditch may need to be replanted with sturdier vegetation, or lined if velocities warrant. The adequacy of other downstream pipes may also need to be checked. Final Site Plan comments (for information purposes only) 10. Temporary grading and construction easements will be necessary from TMP's 56A2 -1 -15 and 56A2 -1 -18.