Loading...
HomeMy WebLinkAboutSDP200900022 Review Comments Preliminary Site Plan 2009-04-08*—&A County of Albemarle Department of Community Development Memorandum From: Max Greene, Current Development engineering review Date: 9 Mar 2006 Subject: Preddy Creek Park Improvements (WP0200900022) The preliminary site plan has been reviewed. 1. Show sight distances at the entrance per VDOT requirements. [VDOT] 2. The State Water protection requires fore -bays on all stormwater detention/control structures. [VSMH] A check dam may suffice if there is available volume in the structure. 3. Travelway will be designed to meet or exceed the VDOT standards for the projected daily traffic count. [18- 4.12.17.d] Gravel surface is not deemed equivalent per [18- 4.12.15.a] 4. The curb and gutter request does not appear to have anything to do with Storm Water Management or an existing use in the rural area per section 18- 4.12.15.g There are no engineering issues. 5. The main access way to the parking areas should be the main road and any side roads will be a spur to the main. Please design the road to VDOT standards for the projected vehicle size and type. Iilc: E I _psp_MRG_Preddy Crcek Park Improveancnts- prcliminary.doc