Loading...
HomeMy WebLinkAboutSDP200900016 Review Comments No Submittal Type Selected 2009-04-10or R ©� COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 DATE: April 13fl' 2009 Charles Luck P.E. [Whitman Requardt & Associates] 9030 Stoney Pointe Parkway Suite 220 Richmond, VA, 23235 RE: SDP- 2009 -00016 North Fork Regional Pump Station Preliminary Dear Sir, The Site Review Committee has reviewed the development proposal referenced above. Preliminary comments for the following divisions of the Department of Community Development and other agencies, as applicable, are attached: Albemarle County Division of Zoning & Current Development (Planner) Albemarle County Division of Zoning & Current Development (Engineer) Virginia Department of Transportation (VDOT). (Pending) Albemarle County Service Authority (ACSA). Albemarle County Geographic and Data Services (GDS) Albemarle County Fire and Rescue Comments reflect information available at the time the development proposal was reviewed, and should not be considered final. However, the Site Review Committee has attempted to identify all issues that could affect approval of the proposed project. Please make the revisions that have been identified as necessary for preliminary approval by the Site Review Committee. If you choose not to make the requested revisions, please submit in writing justification for not incorporating such revisions. Submit eight (8) full size copies and one (1) 11" x 17" copy to the Department of Community Development including responses to each of the attached comments of the Site Review Committee by Monday April 27'x' 2009. Failure to submit this information by this date will result in suspension of the review schedule. Review will resume when revisions are submitted along with a reinstatement fee of $65. Please contact me at your earliest convenience if you have questions or require additional information. Sincerel C— emerald Gatobu, Principal Planner County of Albemarle Department of Community Development Current Development 401 McIntire Road Charlottesville, VA 22902 -4596 Phone: (434)296 -5832 Ext 3385 Fax: (434)972-4126 .�illln'• County of Albemarle Department of Community Development Memorandum To: Charles Luck From: Gerald Gatobu, Principal Planner Division: Zoning and Current Development Date: April 10, 2009 Subj ect: SDP2009 -00016 North Fork Regional Pump Station Preliminary The County of Albemarle Division of Zoning and Current Development will grant or recommend approval of the preliminary site plan referred to above once the following comments have been addressed: [Each comment is preceded by the applicable reference, which is to the Subdivision/Zoning Ordinances unless otherwise specified.] ❑ 32.5.6 The preliminary site plan shall contain the following information: ❑ a. Zoning; descriptions of all variances, zoning proffers and bonus factors applicable to the site; Please include the zoning proffers applicable to tax map and parcel number 32 -6A on the site plan [ZMA 98 -27 and ZMA 95 -041. There is a proposed trail (per the proffers for ZMA 98 -27) that will be Magisterial district; this property is in the Rio Magisterial District and not Rivanna Magisterial District. County and State; Indicate on the preliminary site plan the county and state (Albemarle County and Virginia) where the property is found. ❑ b. Written schedules or data as necessary to demonstrate that the site can accommodate the proposed use, including: Maximum amount of impervious cover on the site; please indicate the maximum amount of impervious cover on the site. ❑ e. Existing landscape features as described in section 32.7.9.44.c.Please add an existing landscape features sheet to the preliminary site plan that meets the criteria set forth in section 32.7.9.4c. [4.17] Any /All proposed outdoor lighting must meet the requirements of section 4.17 of the zoning ordinance. vlRcirn�` . County of Albemarle Department of Community Development Memorandum To: Gerald Gatobu, Principal Planner From: John P. Diez; Engineering Review Division: Current Development Date: April 10, 2009 Subject: SDP200900016 North Fork Regional Pump Station. - Preliminary Site Plan The preliminary site plan for North Fork Regional Pump Station., submitted on March 24, 2009, has been reviewed. Current Development Engineering has the following comments: Preliminary Site Plan Comments 1. Please revise drainage area #2 and move and relocate the Point of Analysis #2 away from the floodplain. In addition, please submit a modified simple method spreadsheet with the updated drainage area. 2. Please provide site distance triangles for the proposed entrance. Final Site Plan Comments 3. A Water Protection Ordinance application must be submitted with an Erosion and Sediment Control plan. Plans should show all disturbed areas, including any pipes being installed for this plan. ::i(il6 North .[ o k Reglia: nal l:'MTIf, SI&ItJOH Albemarle Service Authkity &ruing 6 cohsempg TO: Gerald Gatobu FROM: Gary Whelan, Civil Engineer DATE: April 10; 2009 RE: Site Plan Technical Review for: North Fork Regional Pump Station SDP200900016 TM 32 -6A The below checked items apply to this site. X 1. This site plan is within the Authority's jurisdictional area for: X A. Water and sewer B. Water only C. Water only to existing structure D. Limited service X 2. A 12 inch water line is located approximately 120' distant. 3. Fire flow from, nearest public hydrant, located distant from this site plan, is Gpm + at 20 psi residual. X 4. An 6 inch sewer line is located approximately 40' distant. 5. An Industrial Waste Ordinance survey form must be completed. X 6. No improvements or obstructions shall be placed within existing or future easements. 7. and plans are currently under review. 8. and plans have been received and approved. 9. No plans are required. X 10. Final sewer plans are required for our review and approval prior to granting tentative approval. 11. Final site plan may /may not be signed. 12. RWSA approval for water and /or sewer connections. 13. City of Charlottesville approval for sewer. Comments: The site plan does not show or incorrectly shows: water line size meter locations waterline locations sewer line locations easements sewer line size expected wastewater flows expected water demands 168 Spotnap Road • Charlottesville + VA 22911 - Tel (434) 977 -4511 • Fax (434) 979 -0698 www.serviceauthoriy.org Application #: I SDP20O9O0016 Short Review Comments Project Name:1 North Fork Regionai Pump Station - Prelim Preliminary — Non - residential Date Completed: 04/08/2009 Reviewer: Andrew Slack E911 Review Status: No Objection Reviews Comments: INO OBJECTION. Date Completed: Reviewer: Review Status: Reviews Comments: Date Completed: Reviewer: Review Status: Reviews Comments: Date Completed: Reviewer: Review Status: Reviews Comments: Date Completed: Reviewer: Review Status: Reviews Comments: 04/06/2009 James Barber Fire Rescue No Objection ndicate the location of fire hydrants. Hydrants must be located within 400 feet of the building by way )f a prepared travel way. 04/10/2009 John Paul Diez Engineer Z &CD Requested Changes 3RC 4/16/09 04/06/2009 Jay Schlothauer Inspections No Objection No Objection ' 04/10/2009 Margaret Maliszewski ARB Requested Changes rhis proposal is scheduled for review by the ARB on May 18, 2009. Comments will be provided after hat meeting. Perna 1 nn r:nunfv of Alhamarla Printari nn* Ttiacrlav Anril 1d 9nnG