Loading...
HomeMy WebLinkAboutWPO200800106 Review Comments Road Plan and Comps. 2009-04-03WPO- 2008 -00106 Old Trail Phase 2 -Block 4 Road PlansFrom: DeNunzio, Joel D., P.E. [ Joel .DeNunzio @VDOT.virginia.gov] Sent: Friday, April 03, 2009 1:59 PM To: Amy Pflaum Subject: WPO- 2008 -00106 Old Trail Phase 2 -Block 4 Road Plans WPO- 2008 -00106 Old Trail Phase 2 -Block 4 Road Plans Amy, VDOT Residency Staff has reviewed the above referenced plan dated 2- 17 -09. The engineer has sent me electronic sheets addressing the last of the VDOT comments on 4 -2 -09 and with the inclusion of those sheets into the plan; I can recommend approval of the plan. Please let the applicant know that a permit from VDOT will be required for any work proposed within the existing road right of way. To ensure that the proposed streets will qualify for addition to the state secondary system of highways, the applicant shall meet the requirements set forth in The 2005 Subdivision Street Requirements (24 VAC 30 -91). It is recommended that the applicant coordinate the items listed in section B -2 of 24 VAC 30 -91 -150 with the VDOT Residency during the time a permit is applied for or prior to starting construction to ensure that proper inspections to the roads occur during the construction phase. If you have any questions, please let me know. Thanks, Joel Joel DeNunzio, P.E. Staff Engineer 434 - 293 -0011 Ext. 120 joel.denunzio @vdot.virginia.gov