HomeMy WebLinkAboutWPO200800106 Review Comments Road Plan and Comps. 2009-04-03WPO- 2008 -00106 Old Trail Phase 2 -Block 4 Road PlansFrom: DeNunzio, Joel D., P.E.
[ Joel .DeNunzio @VDOT.virginia.gov]
Sent: Friday, April 03, 2009 1:59 PM
To: Amy Pflaum
Subject: WPO- 2008 -00106 Old Trail Phase 2 -Block 4 Road Plans
WPO- 2008 -00106 Old Trail Phase 2 -Block 4 Road Plans
Amy,
VDOT Residency Staff has reviewed the above referenced plan dated 2- 17 -09. The
engineer has sent me electronic sheets addressing the last of the VDOT comments
on 4 -2 -09 and with the inclusion of those sheets into the plan; I can recommend
approval of the plan.
Please let the applicant know that a permit from VDOT will be required for any
work proposed within the existing road right of way.
To ensure that the proposed streets will qualify for addition to the state
secondary system of highways, the applicant shall meet the requirements set
forth in The 2005 Subdivision Street Requirements (24 VAC 30 -91). It is
recommended that the applicant coordinate the items listed in section B -2 of 24
VAC 30 -91 -150 with the VDOT Residency during the time a permit is applied for or
prior to starting construction to ensure that proper inspections to the roads
occur during the construction phase.
If you have any questions, please let me know.
Thanks,
Joel
Joel DeNunzio, P.E.
Staff Engineer
434 - 293 -0011 Ext. 120
joel.denunzio @vdot.virginia.gov