To: Summer Frederick, Current Development Project Planner
From: Phil Custer, Current Development engineering review
Date: 28 April 2009
Subject: Faulkner Falls Final (before Preliminary) Plat (SUB- 2009 - 00051)
The final plat for Faulkner Falls, received on 25 March 2009, has been reviewed. This project had a
preliminary plat which expired in November of 2008 (SUB- 2007 - 00306). At that time, engineering
review had just completed its review and approved the construction documents (ESC, SWM, and road
plans) under WPO- 2008 - 00054. Engineering review can recommend approval to this plat once the
following comments are satisfied.
1. A Deed of Dedication and Easement is needed for all required drainage easements associated with
this final plat. Please refer to the County's website for the most recent forms and procedural
guidelines that need to be followed when submitting a Deed of Dedication and Easement. The
wording shown for the drainage easements on the Deed of Dedication and Easement needs to be
exactly the same as the wording on the final plat.
2. All bonds (SWM, ESC, and Road) must be posted prior to plat approval.