Loading...
HomeMy WebLinkAboutSDP200200132 Review Comments Major Amendment, Final Site Plan 2004-04-28 tr r Page l of 1 Margaret Doherty To: Brian P. Smith Subject: Crossroad Major Amendment SDP-02-132 Hi Brian, So, I got a copy of Margaret M.'s approval letter, so you have all your approvals, except Erosion and Sediment Control. When that plan is approved, you may submit two mylar copies of the plan and one paper copy to Deanna Graves in Planning for our signature. Let me know if you have any questions, Margaret Doherty Senior Planner Department of Planning and Community Development 401 McIntire Road Charlottesville,VA 22902-4596 (434)296-5823 x3250 4/29/2004 t , �of AL� �.�I-li IWl�lf frincito COUNTY OF ALBEMARLE ' Department of Planning&Community Development 401 McIntire Road,Room 218 Charlottesville,Virginia 22902-4596 (434)296-5823 Fax(434)972—4012 April28,2004 Brian Smith,PE • Civil Engineering, Inc. 105 West High Street Charlottesville,VA 22902-5018 RE: ARB-2002-145: Crossroads Store Phases 2 and 3 Dear Mr. Smith, I have reviewed the plans with revision date of March 29, 2004 submitted for the above- referenced project. The revisions address all outstanding conditions of ARB approval. You may consider this letter your Certificate of Appropriateness,but please note the following: 1. The approved light fixture for the canopy is the flat lens Lumark QC Quadra-Mark. 2. Be sure to include the notes regarding coordination of materials, colors, and details on the architectural plans submitted with the Building Permit application to avoid delays in ARB sign-off of the permit. This approval is predicated on the fact that the design and materials, as proposed and exhibited for review, will be used. The acceptance of approval implies that the applicant has agreed to execute the design as indicated on the site plan, attachments, materials, samples, and other submittal items presented.. Any change in the approved design or matenals will require an amendment to the plan and must be reviewed and approved by the Architectural Review Board. Sincerely, 71/ Marg ret Maliszewski Design Planner Cc: ARB File Margaret Doherty North Garden Crossroads Inc.,PO Box 149,North Garden,VA 22959 MEMORANDUM FROM: Keith Lancaster, Zoning Plans Reviewer DATE: April 19, 2004 RE: SDP 02-132, Crossroads Store Phase 2 & 3 Revised March 29, 2004 The Albemarle County Department of Building Code and Zoning Services will approve this site plan amendment for zoning compliance when the following items have been satisfactorily addressed. The Building Official may provide separate comments. [Each comment is preceded by the applicable reference, which is to the Zoning Ordinance unless otherwise specified.] 1. [32.5.6(a)] Provide the adjacent parcel information for TMP 99-2 on the site plan. 2. [32.5.6(a)] Reference and note all conditions of SP 2002-073 on the site plan. 3. [32.5.6(a)] Provide a north point on the site plan. 4. Please remove note 16 from the site plan. 5. [32.5.6(b)] Financial institutions require 1 space per 150 SF of gross floor area, plus 25 SF per drive-in aisle. SP 02-73 allows for 2 drive-in aisles at this site. Provide the following "Parking Schedule" on the plan. • Financial institutions require 1 space per 150 SF, plus 25 SF per drive-in aisle. 2 x 25 SF = 50 SF + 150 SF = 200 SF • Spaces Required, 2215 SF/200 SF = 11 required parking spaces 6. [32.5.6(b)] The Parking Schedule notes "Medical/Dental" office use for this site. Dental clinics require 1 space per 175 SF of net floor area. Professional office (Medical) requires 1 space per 200 SF of net floor area. The use requiring the most parking should be noted within the Parking Schedule. Revise the schedule from "Medical/Dental" to Dental clinic @ 1 space per 175 SF. 7. [30.6] The final plan approval is subject to the issuance of a Certificate of Appropriateness from the Architectural Review Board. Margaret Doherty From: Brian P. Smith [bpspe@earthlink.net] Sent: Tuesday, January 06, 2004 4:12 PM To: Margaret Doherty Subject: Re: Crossroads.Store Margaret, I remember that Werner needed to spec out a light under the canopy of the drive thru window before we received approval. I saw Werner a few weeks ago and he knows he needs to get this info you me, and thus to the county. he still wanted to do the project, maybe this spring. let me know if any expiration dates are coming up. thanks! have a great evening. Brian P. Smith, PE Civil Engineering, Inc. 105 West High Street Charlottesville,VA 22902 (434)296-3644 1 6 . Margaret Doherty To: Brian Smith Subject: Crossroads Store Hi Brian, Happy Holidays. I'm cleaning out my files and found the Crossroads Store Minor Amendment(SDP-02-132). If my memory serves, I'm waiting for a mylar showing the changes as required by the conditions of approval??? Let me know what's up--I don't know if this expires at some point without a mylar or what. Thanks, Margaret Doherty Principal Planner Department of Planning and Community Development 401 McIntire Road Charlottesville,VA 22902-4596 (434)296-5823 x3250 1 GUIDELINES ALBEMARLE COUNTY PLANNING COMMISSION _.. .. .. .,,;_ .w. ALB ARLE COUNTY VIRGIN IA IA Thank you for attending tonight's Planning Commission meeting. Asa courtesy-tp;ottiers,.please:tun off ail pageN rtd cell phones during the meeting, If you wish to address the Commission on an agenda item, please raise your hand or stand when the ,Y , .lt± . ., ,,..: Chairman(during the 2003 Calendar Year,the Chairman is William Rieley)asks for public comments for that item. , , ,,(P awl w, 'emu .. No more than three persons at any meeting will be allowed to speak(three minute time limit per person)during the time set aside z� ., A EN AFAR ' y' s _. for"Other Matters Not Listed on the Agenda From the Public'at the beginning of each meeting. If you are with a group of people,you mays` "`. e� want to have a spokesperson present your position to the Commission and have others in agreement recognized by standing. . �' EBRUARIf ° VOi,� Margaret Doherty .5 .,b s�,, ,;, . Principal Planner During public hearings,the Commission will try to hear everyone who wishes to speak on a subject. Please use sign upsheets E'" �' : located on the table outside the meeting room to indicate your desire to speak. Sign up sheets will be provided to the Chair at the beginning "`., y I :3 '.; i,R of the meeting. If aprevious speaker has statedyour position,you maymake that known byreference. Each applicant shall be allowedM N P P PPjr-rst. ,a(-M. .s:' ,, to make a presentation not to exceed ten minutes,and a closing remark at the close of the hearing on the matter not to exceed five minutes. f,i . �. ����`� a ," Each other person speaking on a matter shall be allowed one appearance not to exceed three minutes. A speaker maynot reserve any : ; 't' . r .__.___. � - ,; �VI ;. time for rebuttal or transfer any time to another speaker. The time limits set forth herein shall not include any time during which the applicant `q .' • h - ` R �. 'F . "R WelOome to nisAileetih of the . 1' or other speaker is responding to questions asked by the Commission. The Recording Secretary shall act as the timekeeper. : �� " I. . _. _ . Albemarie'C`oun i `� v ..,,,, ` g , _ ty . ;.r,,lgj•e .midi ion #• In order to give all speakers equal treatment and courtesy,the Commission requests that speakers adhere to the following guidelines: �( :, c r t,- -� y �=-- to; j }':. � . ,� J' 'H.:p' :=crsas..:�;."" x. 4::�,`�R,�ea�L�.e �`.a.'t�` '.G n (Note:All comments are recorded on tape); <a fi; �;_- r ,,' { Rodni .,4S,,Thorns w ,f '''W. - a . r- Bra-Ed' erD Come forwan-I to the speaker's podium and state your name(if you have an unusual spelling for your name,please spell it for the ;.�' .�� :� �,� .- _ç\ JackJbuett �`�����,----�-�--,,� g � , �,� , recorder); A •• R o 1 rl t° , J 11 Drtricta-:-, p Y "i,_. I Do not s speak from our seat or out of tum; g W n Address comments directly to the Commission as a whole; �s 3 ' k• > � Witi2lm -_ Pee Craddock " Tracey Hopper` r= State your position and give facts and other data to back it up; � }", � ,��� 1 ,4 � ,; ;,,-�.< �-,,, � !f you represent a group or organization, ask others present to rise and be recognized; ( Sco S`v I(�e Distriet , �' Vic@=Chair,,,, n Debate is .,~_� -,~�w prohibited; 5k '_�? ;. K,..,: .:`z, .,„,.. ,,,, ,. ' I, ;, 1 ;- '.". „.K ._ . � ;> Rafanna DI i'ICt Give written statements and other supporting material to the Clerk(written comments are also welcome ifyou do not wish to `" f; r: speak); 47 'I''4 1 ¢ ,., , ., v,,,,gn, if, Additional speakers are asked to step forward and stand to the side of the aisle in the interest of time; ,_\‘Willian4L-Filley:�. F, -William D. Rie'#e :M�Please hold all applause. What , 1 Dr rldd : . .:. `� >; I ail l r... Secretary,Albemarle County Planning Commission 44 , i , 4,San' u' i ee- �ittri 401 McIntire Road a <AF 6 ,rim Charlottesville,Virginia C�ared� ;, gy • $ dj&ej Gg Loeetein (an)ti ifer ;22902-4596 At-LArge Represenfatrve ; : A st. noun Attorney ti -.a .,,. :. ,. V, Wa 'ne7eIir..> teg f H . - ecr- tarry -,w I „. • The Albemarle County Planning Commission meets in Room 241, Second Floor, County Office Building,401 McIntire Road, Charlottesville,Virginia, 22902-4596,Tuesdays at 6:00 p.m. Because of the potentially large number of items presented for consideration, the Commission has established certain guidelines for citizen participation (see back of this agenda for a complete listing). These guidelines help to ensure that everyone who wishes to speak can do so, and that the Commission can benefit from hearing as many different people as possible in the shortest period of time. Matters generally are considered by the Commission in the order listed on the agenda. Matters on the "consent agenda" are routine and are normally adopted or approved by one motion without discussion. Items listed on the regular agenda are taken up one at a time. Keep in mind that the agenda is for the convenience of the Commission and the public and the agenda can be altered by the Commission at any time without prior notice when it is considered to be in the best interest to do so. Information concerning agendas and their scheduling is available from the Department of Planning & Community Development, 296-5823; by calling the Agenda Information Line, 296-5824; or on the Internet at http://www.albemarle.org/agenda.html. If you wish to have your name added to the agenda mailing list, call the Planning Department at the above number. TENTATIVE FEBRUARY 11,2003 6:00 P.M. 7. Old Business. ROOM 241,COUNTY OFFICE BUILDING 8. New Business. 9. Adjournment-8:30 p.m. 4:00 p.m. Worksession—Room#235: a. Hollvmead Town Center-This worksession will focus on the traffic impacts to existing public roads and the potential mitigation options for those impacts. (Michael Barnes) • CONSENT AGENDA 6:00 p.m. Meeting Room#241: 1. Call to order and establish quorum. 2. Other Matters Not Listed on the Agenda from the Public. 3. Review of Board of Supervisors Meeting—February 5, 2003. a. Approval of Planning Commission Minutes—December 17, 2002. 4. Consent Agenda(on next sheet). b. Montgomery Ridge-Request for a finding that proposed Open Space is appropriate per Section 4.7.1 of the Zoning Ordinance and request of a waiver of Section 4.2.3.2 of the Zoning Ordinance 5. Deferred Items: which prohibits disturbance of critical slopes to allow for the creation of 53 lots on 52.372 acres. (Yadira Amarante) a. SP-02-023 White Gables (Sign#56, 57)-Request for special use permit to allow development of 74 c. SDP-2002-137 ACAC 0 Four Seasons Major Amendment Critical Slope Waiver-Request, condominium dwelling units in accordance with Section 23.2.2.9 of the Zoning Ordinance which allows for pursuant to Section 4.2.5.2, to allow for the disturbance of critical slope. (Francis MacCall) R-15, Residential use in a CO, Commercial Office district. The property, described as Tax Map 60, d. SDP-03-03 Greenbrier Square Cooperative Parking Agreement-Request to provide required Parcels 26 and 26A, contains 7.097 acres, and is located in the Samuel Miller Magisterial District on the parking cooperatively among two or more uses in the Greenbrier Square development. (Margaret north side of Rt. 250W(Ivy Road), approximately 1/4 mile west of the intersection of Ivy Road and the Doherty) 29/250 By-pass.The property is zoned CO, Commercial Office, and EC, Entrance Corridor. The Comprehensive Plan designates this property as Office Service in Neighborhood Seven. (Susan Thomas) DEFERRED FROM THE JANUARY 28, 2003 PLANNING COMMISSION MEETING. b. ZMA-02-01 Fontaine Avenue Condominiums (Sign#77,81)-Request to rezone 12.606 acres from Highway Commercial (HC)to Residential (R-15)to allow 112 dwelling units. The property, described as Tax Map 76 Parcels 12A and 12G, is located in the Samuel Miller Magisterial District on the north side of Rt. 702 (Fontaine Avenue) approximately .25 miles west of the intersection of Fontaine Avenue and Route 29. The Comprehensive Plan designates this property as Neighborhood Service, in Neighborhood 6. (Michael Barnes)DEFERRED FROM THE JANUARY 28, 2003 PLANNING COMMISSION MEETING. 6. Public Hearing Items: a. SP-02-071 Crown Orchard Company Pinnacle/Carters Mountain (Sign#39&66)-Request for a special use permit to allow the co-location of two additional arrays of six(6)antennas at between 60 an 70 feet on an existing tower 205 foot tall tower. This request is being made in accordance with Section 10.2.2.6 of the Zoning Ordinance, which allows for radio-wave transmission and relay towers, and appurtenances. The property, described as Tax Map 91, Parcel 28, contains 234.165 acres, zoned RA, Rural Areas. This site is located in the Scottsville Magisterial District, on Carter's Mountain Trail, approximately 1 mile south of the intersection with the Rt. 53 (Thomas Jefferson Parkway). The Comprehensive Plan designates this site as Rural Area 4. (Stephen Waller) b. SP-02-073 Crossroads Store Phase 2&3 Bank Drive-in window(Sign#89,90)-Request for special use permit to allow a drive-in window serving a proposed bank at the Crossroads Store in accordance with Section 22.2.2.10 of the Zoning Ordinance which allows for drive-in windows serving or associated with permitted uses. The property, described as Tax Map 99 Parcels 1,1A and 5, contains 3.956 acres, and is located in the Samuel Miller Magisterial District on Plank Road (State Route 692)on the northeast corner of the intersection of US Route 29 and State Route 692. The property is zoned C-I Commercial and Entrance Corridor. The Comprehensive Plan designates this property as Rural Area 3. (Margaret Doherty) - z 1 Margaret Doherty To: Brian Smith Subject: Crossroads Brian, Here are Susan's comments. If you have any questions, please feel free to contact her at 296-5832 x3024. FROM: Susan Carol Snead, Zoning Plans Reviewer DATE: January 24, 2003 RE: SDP 02-132 Crossroads Store Phase 2 & 3 The Albemarle County Department of Building Code and Zoning Services will approve this site plan amendment for zoning compliance when the following items have been satisfactorily addressed. The Building Official may provide separate comments. [Each comment is preceded by the applicable reference, which is to the Zoning Ordinance unless otherwise specified.] 1. [32.5.6(a)] A Special Use Permit is required for the proposed drive-thru. Once approved, please reference the SP number on the plan and note all conditions of the SP on the plan. 2. [32.5.6(a)] Please show the location of all adjacent parcels on the plan. Please note on the plan the owner, tax map and parcel number, zoning and present use of adjacent parcels. TMP 86-27 is not an adjacent parcel. Please remove this information from the plan. 3. [4.12.6.6] The retail area requires 1 loading space and the office area requires 1 loading space. Please note on the plan the number of required and provided loading spaces and show all calculations. The required number of loading spaces is calculated on the total square footage of both the existing uses and the proposed uses. It appears that the total square footage for retail is 14,470 and for offices is 10,275. Loading spaces for retail and office are calculated at 1 space per 8,000 sf gross. 4. [32.5.6(n)] Please note on the plan: No outdoor luminaires that emit 3,000 or more maximum lumens are proposed for this site. 5. [32.6.6(j)] [4.17.4(b)] Include a photometric plan on the site plan demonstrating that parking area luminaires are in compliance with 4.17.4 b. A photometric plan is required for all proposed lighting. 6. [30.6] The final plan approval is subject to the issuance of a Certificate of Appropriateness from the Architectural Review Board. MaretDoherty `_- Principal Planner Albemarle County Department of Planning and Community Development 401 McIntire Road Charlottesville,VA 22902 PH(434)296-5823 x3250 FX(434)972-4012 1 Crossroads Store Phase 2 and 3 Page 1 of 1 Margaret Doherty From: Lynn, Jeremy Sent: Friday, January 24, 2003 10:15 AM • To: 'mdoherty@albemarle.org' Subject: Crossroads Store Phase 2 and 3 With regards to the Revised Site Plan for the Crossroads Store, our concerns with the Plum tree being removed along Rt. 29 have been addressed. We required the tree to be removed and the plans now indicate that the tree will be removed. Jeremy Lynn Virginia Department of Transportation Charlottesville Residency 01/24/2003 BRIAN P.SMITH,PE , Ain: CIVIL ENGINEERING, INC 1180. 105 WEST HIGH STREET CHARLOTTESVILLE,VA 22902-5018 PHONE (434)296-3644 RECEIVED IN FAX (434) 296-2041 'PLANNING JAN 10,2003 January 9, 2003 Margaret Doherty County of Albemarle Dept. of Planning&Community Dev. 401 McIntire Road Charlottesville, VA 22902 RE: Crossroads Store Phase 2&3 (SP-02-73 and SDP-02-132) Site Plan Amendment Dear Margaret, Attached please find the requested seven(7)copies and one 11"x 17"reduced copy of the revised plans. These revisions reflect comments from all of the departments including VDOT. 1. ARB On Monday of this week the ARB approved the plan with the conditions that Margaret M. recommended.Even though I haven't received Margaret's official letter from that meeting,I have made changes to this plan to reflect those conditions. 2. Susan Snead All of Susan's comments have been address except#1 and this will occur when we receive B.O.S. approval.Item 9& 10 refers to lights that emit 3000 or more lumens.We won't have any this bright. 3. Jay S. The HC parking has been addressed as requested. 4. Patrick Powell The road names have been added. 5. Allen Schuck After discussing this item with him,and he with others in the Engineering Dept.the Stormwater management and BMP requirements have been dropped.I can show a simple E&S plan later if wish during the tentative approval process. GOLF COURSE DESIGN • ENGINEERING • SITE DESIGN • LAND PLANNING Margaret Doherty January 9,2003 Page 2 6. VDOT The Plum tree that blocks the view on Rt. 29 will be removed and is shown as such on the plans. 7. VDH/DEQ As you know,I spoke with John Schofield and he has sent an email(of which I forwarded to you) stating the existing sewerage treatment plant will handle the additional flows anticipated from Phases 2&3. I hope this addresses everyone's comments.If you need additional information please contact me. Sincerely, I, Brian P. Smith,PE. President Enclosures(7 copies+ 1 reduction) Account ID:02-005-00/Margaret Doherty BRIAN P. SMITH, PE GOLF COURSE DESIGN • ENGINEERING • SITE DESIGN • LAND PLANNING Margaret Doherty From: Brian P. Smith [bpspe@earthlink.net] Sent: Thursday, January 09, 2003 12:49 PM To: Margaret Subject: Crossroads Store Phase II & Ill Expansion (fwd) Margaret, Here's the okay from the VDH with regard to the expansion to the Crossroads Store. Make it a great day! Brian Forwarded message Date: Thu, 09 Jan 2003 12:23:21 -0500 From: bpspe@earthlink.net Reply-to: John Schofield <jschofield@vdh.state.va.us> To: bpspe@earthlink.net Cc: RVANLIER<rvanlier@Vdh.state.va.us>,carl christiansen <cch ristians en @vd h.state.va.u s> Subject: Crossroads Store Phase II & Ill Expansion Hello Brian: I have evaluated the information that you have supplied to me with regards to the Phase II and III expansion [basically two wings to be added] to the Crossroads Store facility in North Garden: -existing STP is rated for 20,000 gpd [verified by DEQ] -long term potable water usage records indicate that water production is well under 10,000 gpd and this does include some usage that does not enter the sewage plant -no sit-down restaurants included in the expansion -no history of violations of the VPDES discharge permit w/DEQ I feel that no upgrade to the sewage treatment works is necessitated by this expansion and concur with your assessment that the original design of the treatment works was intended to include the buildout in Phase II and III. The VDH engineer covering that area is Rob Van Lier,PE, in Earlysville, 434-975-0897. Rob may have direct, firsthand knowledge of this facility and may also have additional input. John C. Schofield, P.E. Western Area Engineer Division of Wastewater Engineering Virginia Department of Health 131 Walker Street Lexington,Virginia 24450 Phone: 540-463-1642 Fax: 540-463-3892 1 Margaret Doherty From: Bill Craun [bcraun@vdh.state.va.us] Sent: Friday, January.03, 2003 9:48 AM To: MDoherty@albemarle.org Cc: William Craun Subject: Crossroads Store Phase 2/3 Major Amendment M1 Margaret, I apologize for not sending a comment for the last site plan meeting as I have been on vacation. Anyway, concerning the above subject, the developer should contact the Regional Engineering Department in Lexington regarding the addition of the bank. Please call me should you have any additional questions. William Craun Field Advisor, Environmental Health Dept. Thomas Jefferson Health Department 1 L lllll �x oategjcc; ALBEMARLE COUNTY Department of Planning and Community Development 401 McIntire Road Charlottesville,VA 22902 (804) 296-5823 x3250 Fax(804) 972-4012 FACSIMILE TRANSMITTAL SHEET TO: FROM: Brian Smith Margaret Doherty ' COMPANY: DATE: 12/31/02 FAX NUMBER: TOTAL NO.OF PAGES INCLUDING COVER. 296-2041 3 PONE NUMBER: SENDER'S REFERENCE NUMBER Crossroads Store Phase 2& 3 NOTES/COMMENTS: Brian, I forgot to include VDOT and ACSA comments in my previous fax. I'll see you on Thursday morning. Crossroads is third on the agenda. Let me know if you have any questions. Margaret 1G/11/ZUUZ 11: au !'AA OU4-t- (J+d/7y VLU'1' UVILLt ALt3 UU LIV uvz • i.• r .) • • COMMONWEALTH of VIRGINIA , A°c'p-. DEPARTMENT OF TRANSPORTATION 701 VDOT WAY BRYAN PHIUP.A. JAMES.L. SHUCET CHARLOTTESVILLE, VA 22911 RESIDENT ENGINEERYAN COMMISSIONER December 10, 2002 • Mr. Glenn Brooks Dept. Of Engineering 401 McIntire Rd. Charlottesville,VA 22902 Site Review Meeting December 19, 2002 Dear Mr. Brooks: The following are our comments: SDP 2002-134 Village Homes II Final Site Plan-Route 1165 ➢ Revised drainage computations required for review. SDP 2002-123 North Pa:atops Commercial Area Preliminary-Route 250 E ➢ A 200' right turn:lane with 200' taper will be required at the existing entrance on Route 250. ➢ A traffic study will be required. Applicant should contact Matt Grimes for detail. ➢ The proposed inner parcel access is to close to Route 250 and will need to be shifted further into the site. In addition,the travelway to the parking area may cause queing into Rt 250 due to its proximity to the entrance. The travelway should either be shifted further in or signed for a 3-way stop to allow traffic to free flow into the site. ➢ A standard commercial entrance will be required on White House Road. ➢ Drainage computations required for review. ➢ Road plans designed in strict compliance with current standards will be required. SDP 2002-132 Crossroads Store Phase 2 & 3 Major Amendment-Route 29 S • and nders the ht ➢ Landscaping along Route 29 has 29.roached itito the sight A tree near the entrance eand approximatelygl0' distance at the entrance on Route behind the curb will need to be removed. SP 2002-073 Crossroads Store Phase 2 & 3 See SDP 2002-132,no additional comments TRANSPORTATION FOR THE 21ST CENTURY AOF ,AR4L. NGRSP COUNTY OF ALBEMARLE Department of Planning&Community Development 401 McIntire Road,Room 218 Charlottesville,Virginia 22902 ph(804)296-5823 x3250 fax(804)972-4012 December 31, 2002 Brian P. Smith,PE 105 West High Street Charlottesville,VA 22902 Dear Mr. Smith, RE: Crossroads Store Phase 2 &3 (SP-02-73 and SDP-02-132), Dear Sir: The Site Review Committee has reviewed the development proposal referenced above. Preliminary Comments for the following agencies, as applicable, are attached: Albemarle County Department of Engineering and Public Works Albemarle County Department of Building Code Enforcement and Zoning Services Albemarle County Depaitment of Planning and Community Development Albemarle County Division of Fire Safety Albemarle County Service Authority Comments reflect information available at the time the development proposal was reviewed, and should not be considered final. However, the Site Review Committee has attempted to identify all issues which could • affect approval of the proposed project. Please make the revisions that have been identified as necessary for preliminary approval by the Site Review Committee. If you choose not to make the requested revisions, please submit in writing justification for not incorporating such revisions. Submit seven full size copies and one 11" x 17" copy to the Depaitment of Planning and Community Development. Responses to the attached comments of the Site Review Committee must be submitted by January 13, 2003. Failure to submit this information by this date will result in suspension of the review schedule. Please contact me at your earliest convenience if you have questions or require additional information. Sin�cerellyy, a V � �� Margaret Doherty Principle Planner Albemarle County Development Departments S P-2002-0.73 SPIN Submission and Comments Drive-sin windowsroads hase2&3Bank Planning SP for Drive-in Window revision 1 reviewer received reviewed decision Margaret Doherty 11/25/2002 12/31/2002 under review Staff will recommend approval of the special permit request for a drive-in window, when the following items have been satisfactorily addressed: 1. Staff has received Architectural Review Board 'advisory comments'siting no objection to the request; and 2. The preliminary site plan is ready to be-approved with conditions. This item is tentatively scheduled for a public hearing before the Planning Commission on March 4, 2003 and final action by the Board of Supervisors on April 9, 2003. This schedule is reliant on having Architectural Review Board 'advisory comments'siting no objection to the request. 12/31/2002 11:57 AM Page 1 of 1 Albemarle County Development Departments SDP-2002-132 SPIN Submission and Comments Crossroads Store Phase 2 &3 Major Planning Preliminary Site Plan - revision 2 reviewer received reviewed decision Margaret Doherty 11/25/2002 12/31/2002 requested changes The Department of Planning and Community Development will approve the preliminary site plan when the following items have been satisfactorily addressed: 1. Board of Supervisor approval of the Special Permit request for a drive-in window; 2. Architectural Review Board preliminary approval; 3. Please revise the site plan to include the following: a. Please provide a landscaping plan in accordance with Section 32.7.9; and b. Please show all sidewalks as five feet wide. 4. All other reviewing agency approvals. 12/31/2002 11:52 AM Page 1 of 1 Albemarle County Development Departments SDP-2002-132 SPIN Submission and Comments Crossroads Store Phase 2 &3 Major Zoning Preliminary Site Plan revision 1 reviewer received reviewed decision susan snead 11/25/2002 12/16/2002 requested changes FROM: Susan Carol Snead,Zoning Plans Reviewer DATE: December 16, 2002 RE: SDP 02-132 Crossroads Store Phase 2 &3 The Albemarle County Department of Building Code and Zoning Services will approve this site plan amendment for zoning compliance when the following items have been satisfactorily addressed.The Building Official may provide separate comments. [Each comment is preceded by the applicable reference,which is to the Zoning Ordinance unless otherwise specified.] 1. [32.5.6(a)]A Special Use Permit is required for the proposed drive-thru. Once approved, please reference the SP number on the plan and note all conditions of the SP on the plan. 2. [32.5.6(a)] Please show the location of adjacent parcels on the plan. Please note on the plan the owner, tax map and parcel number,zoning and present use of adjacent parcels. 3. [32.5.6(b)] Please note on the plan the maximum number of employees. 4. [32.5.6(n)] Please dimension the existing building. 5. Due to zoning text amendments to the lighting ordinance, please change the lighting notes to the following: [4.17.4] Please note on the plan, "Each outdoor luminaire equipped with a lamp which emits 3,000 or more maximum lumens shall be a full cutoff luminaire and shall be arranged or shielded to reflect light away from adjoining residential districts and away from adjacent roads." [4.17.4.3] Please note on the plan, "The spillover of lighting from outdoor luminaires onto public roads and property in residential or rural;areas zoning districts shall not exceed one-half(1/2)foot candle." 6. [4.12.6.6] Medical/dental offices require 1 parking space per 200 square feet net. It appears that the gross square footage was used to calculate the parking. The required number of spaces for Phase 2 medical/dental offices is 9. The required number of spaces for Phase 3 medical/dental offices is 6. The total number of required spaces for Phase 2 is 58. The total number of required spaces for Phase 3 is 34. The total number of required spaces for the entire project is 187. Please revise the notes on the plan. 7. [4.12.6.6] The retail area requires 1 loading space and the office area requires 1 loading space. Please note on the plan the number of required and provided loading spaces and show all calculations. 8. [32.5.6(n)] Show the location of all outdoor lighting on the plan. 9. [32.6.6(j)] Provide a description and photograph or diagram and show the location of each type of 12/31/2002 10:39 AM Page 9 of 10 Albemarle County Development Departments SDP-2002-132 SPIN Submission and Comments Crossroads Store Phase 2 &3 Major Zoning Preliminary Site Plan revision 1 reviewer received reviewed decision susan snead 11/25/2002 12/16/2002 requested changes outdoor luminaire that emits 3,000 or more initial lumens. Please be aware that installation of such luminaires in the future that are not shown on this plan shall require an amendment to this plan. 10. [32.6.6(j)] [4.17.4(b)] Include a photometric plan on the site plan demonstrating that parking area luminaires are in compliance with 4.17.4 b. 11. [30.6]The final plan approval is subject to the issuance of a Certificate of Appropriateness from the Architectural Review Board. • 12/31/2002 10:39 AM Page 10 of 10 Albemarle County Development Departments SDP-2002-132 SPIN Submission and Comments Crossroads Store Phase 2 &3 Major Building Preliminary Site Plan revision 1 reviewer received reviewed decision Jay Schlothauer 11/25/2002 , 12/04/2002 requested changes Based on plans revised November 12, 2002. Due to the total number of parking spaces proposed for this site (194), there must be six barrier-free parking spaces. These should be distributed around the buildings, and must include some van- accessible spaces. It is recommended that one van-accessible space be provided for the lower elevation building entrances, and one for the upper elevation entrances. [2000 Virginia Uniform Statewide Building Code; 1996 BOCA National Building Code, Sections 1105.1 and 1105.4] 12/31/2002 10:39 AM Page 2 of 10 Albemarle County Development Departments SDP-2002-132 SPIN Submission and Comments Crossroads Store Phase 2 &3 Major E-911 Mapping Preliminary Site Plan revision 1 reviewer received reviewed decision patrick Powell 11/25/2002 12/04/2002 requested changes Approval from the Office of Geographic Data Services will be granted when the following changes have been made: 1. Please label the road name, Monacan Trail Rd,for US Route 29. 2. Please label the road name, Plank Rd,for SR 692. • Patrick Powell Office of Geographic Data Services 434.296.5823 x 3030 434.972.4012 (fax) ppowell2@albemarle.org • 12/31/2002 10:39 AM Page 3 of 10 C Albemarle County Development Departments SDP-2002-132 SPIN Submission and Comments Crossroads Store Phase 2 &3 Major Engineering Preliminary Site Plan revision 1 reviewer received reviewed decision Allen Schuck 11/25/2002 12/20/2002 requested changes To: Margaret Doherty, Planner From: Allan Schuck, Engineer Subject: SDP 2002-132 Crossroads Store Phase 2 &3, Major Amendment, Preliminary Site Plan Date received: 03 Dec 2002 Date of Comment: 20 Dec 2002 The preliminary site plan for the Crossroads Store Phase 2 &3, Major Amendment, received on 03 Dec 2002 has been reviewed. The Engineering Department will recommend approval when the following items have been addressed: 1. It appears that some stormwater management may be necessary. Please provide conceptual BMP computations and design as given in the interim design manual for Phase 2 &3. Include drainage area maps. Conceptual BMP's must capture as much site drainage as practicable and meet target removal rates. [17.315, 18-32.56k] 2. The approval of the special permit for the proposed bank drive-in. The following items must be reviewed and approved by the Engineering Department before tentative approval of the final site plan can be granted. A completed submittal form and application, available at the Engineering Department, must accompany all submittals. The required number of copies and the required fees are indicated on the form and application. A.An erosion control,plan will be needed if disturbances exceed 10,000 SF,. The erosion control plan should contain a narrative and computations. [18-32.7.4.3, 17-203] B.A completed application and fee for erosion control and stormwater management, if applicable. [17- 203, 17-303] C. A stormwater management/BMP plan and computations. Computations must include water quality and detention routings for the 2yr and 10yr storms. [17-304] D.A completed stormwater management facilities maintenance agreement and fee, if applicable. [17-323] E. Drainage computations. [18-32.7.4, Policy] VDOT approval will also be required for'final site plans and computations must accompany site plan submittals. Copy: file 2415 File: SDP-2002-132. rev0.doc 12/31/2002 10:39 AM Page 4 of 10 I Albemarle County Development Departments SDP-2002-132 SPIN Submission and. Comments Crossroads Store Phase 2 &3 Major Fire/Rescue Preliminary Site Plan revision 1 reviewer received reviewed decision Jay Schlothauer 11/25/2002 12/04/2002 approved Based on plans revised November 12, 2002. No comments or conditions. 12/31/2002 10:39 AM Page 5 of 10 Albemarle County Service Authrity Serving♦Conserving TO: Margaret Doherty, Principal Planner FROM: Peter C. Gorham, Senior Civil Engineer " DATE: December 19, 2002 RE: Site Plan Technical Review for: Crossroads Store Phase 2&3 Major Amendment (TM 99, Parcels 1, 1A, 5) The below checked items apply to this site. .SDP-02-132 SP-02-073 X 1 . This site plan is not within the Authority's jurisdictional area for: X A. Water and sewer B. Water only C. Water only to existing structure D. Limited service 2 . A inch water line is located approximately distant . 3 . Fire flow from nearest public hydrant, located distant from this site plan, is gpm + at 20 psi residual . 4 . A inch sewer line is located approximately distant. 5 . An Industrial Waste Ordinance survey form must be completed. 6 . No improvements or obstructions shall be placed within existing or future easements. 7. and plans are currently under review. 8 . and plans have been received and approved. 9. No plans are required. • 10 . Final and plans are required for our review and approval prior to granting tentative approval. 11 . Final site plan may/may not be signed. 12 . RWSA approval for water and/or sewer connections. Comments: The site plan does not show or incorrectly shows: meter locations waterline size waterline locations sewer line size sewer line locations expected wastewater flows easements expected water demands 168 Spotnap Road • P.O. Box 2738 • Charlottesville, VA 22902 • Tel (434) 977-4511 • Fax (434) 979-0698 www.acsanet.com RECEIVED IN PLANNING DEC. 17,2002