Loading...
HomeMy WebLinkAboutWPO200800091 Review Comments Bond Estimate 2009-04-08PROJECT NAME: The Meadows Expansion FILE #: WPO200800091 DATE APPROVED: Not yet approved Item Unit Amount Unit Cost Subtotal SWM BASIN 1 dam const.off site material cubic yard 800 $15.00 $12,000 Culvert pipe linear foot 40.00 $25.00 $1,000 Orifice Plate each 1.00 $300.00 $300 Trash Rack each 1.00 $300.00 $300 SWM BASIN 2 dam const.off site material cubic yard 20 $15.00 $300 Culvert pipe linear foot 30.00 $25.00 $750 Orifice Plate each 1.00 $300.00 $300 Trash Rack each 1.00 $300.00 $300 SUBTOTAL 15,250 25% Contingency $3,813 TOTAL $19,063 ROUNDED TOTAL $19,100 min total after reduction $3,820