Loading...
HomeMy WebLinkAboutWPO200800106 Review Comments Bond Estimate 2009-04-15Development Name Old Trail Phase 2, Block 4 Roads W P0200800106 ROAD Construction Bond Estimate (roads, site work, storm sewer) Item $107,722.24 contigency 25% $26,930.56 No. Unit Unit Cost Cost Number Phase "A" 120.6 cy $43.09 $5,194.74 installed seal Golf Drive (Reas Creek Drive; 11 +15 to 14 +52.2 road length 337.2 ft 0.0 sy $7.56 $0.00 1 aggregate base 9.0 in d 337.2 ft L 26.0 ft W 243.5 cy $43.09 $10,493.85 2 blotted or prime &double seal 0.0 ft L 18.0 ft W 0.0 sy $7.56 $0.00 3 asphalt base 4.0 in d 337.2 ft L 26.0 ft W 163.7 tons $88.20 $14,434.32 4 asphalt surface 2.0 in d 337.2 ft L 26.0 ft W 81.8 tons $98.28 $8,041.98 6 curb CG -2 0.0 ft L 0.0 ft W 0.0 ft $10.08 $0.00 7 curb CG -6 434.0 ft 674.4 ft $16.59 $11,188.30 8 sidewalk, asphalt 0.0 in d 0.0 ft L 0.0 ft W 4 0.0 tons $88.20 $0.00 9 sidewalk, concrete 8' width 1 674.4 ft $27.98 $18,869.71 10 ramp CG -12 2 4 $378.00 $1,512.00 11 street name sign 1 2 $78.00 $156.00 12 traffic control sign 0.0 ft $20.16 6 $59.22 $355.32 13 Street Trees 2 $1,638.00 10 $250.00 $2,500.00 14 guardrail (or rebuild wall in right -of -w 0 ES @D$3700 0.0 ft $20.16 $0.00 15 manhole or drop inlet 0.0 ft $189.00 9 $1,638.00 $14,742.00 16 pipe, rcp (15 to 48 ") 0.0 in d 0 ES -1,2 $250 0 EC -1 $200 480.0 ft $27.72 $13,305.60 17 pipe, rcp (54 to 72 ") 54.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $189.00 $0.00 18 pipe, pvc (4 to 10 ") 8.0 in d 0.0 ft $175.20 0.0 ft $7.56 $0.00 19 pipe, cmp (15 to 48 ") 15.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $27.72 $0.00 20 pipe, cmp (54 to 72 ") 60.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $175.20 $0.00 21 rip -rap, placed 0.0 ton $37.80 $0.00 22 E &S fabric,EC -2,3 0 ft L 0 ft W 0.0 sy $12.60 $0.00 23 clear and grub (for wooded sites) 0.0 ft L 0.0 ft W 0.0 acre $12,600.00 $0.00 24 grading (per cy for cut or import only; 600.0 cy fill 500.0 cy cut 600.0 cy $3.78 $4,158.00 24 CBR tests (1 every 0.1 mi. per road) 337.2 ft L 0.674 inc of 500' 2 $189.00 $321.30 25 as -built drawings (1 k + price per 0.1 337.2 ft L 0.064 mi. 1 $1,260.00 $2,260.00 26 survey and layout (price per 0.1 mi.) 337.2 ft L 0.064 mi. 1 $630.00 $1,630.00 27 mobilization 1 $630.00 $630.00 28 VDOT surety (1 lane) 337.2 ft L 0.064 mi. 2 Lanes $2,000.00 $2,554.55 29 VDOT maintenance fee (1 In rd, 1 yr) 337.2 ft L 0.064 mi. 2 Lanes $150.00 $191.59 30 VDOT admin. Cost recovery fee(1 Iar 337.2 ft L 0.064 mi. 2 Lanes $100.00 $377.73 cost sum $107,722.24 contigency 25% $26,930.56 Total $134,660 Claremont Lane 24 +23 to 26 +40 road length 217.0 ft 1 aggregate base 6.0 in d 217.0 ft L 30.0 ft W 120.6 cy $43.09 $5,194.74 2 blotted or prime &double seal 0.0 ft L 18.0 ft W 0.0 sy $7.56 $0.00 3 asphalt base 3.0 in d 217.0 ft L 30.0 ft W 91.1 tons $88.20 $8,038.55 4 asphalt surface 2.0 in d 217.0 ft L 30.0 ft W 60.8 tons $98.28 $5,971.49 6 curb CG -2 0.0 ft $10.08 $0.00 7 curb CG -6 434.0 ft $16.59 $7,200.06 8 sidewalk, asphalt 0.0 in d 0.0 ft L 0.0 ft W 0.0 tons $88.20 $0.00 9 sidewalk, concrete 5' width 434.0 ft $15.00 $6,510.00 10 ramp CG -12 4 $378.00 $1,512.00 11 street name sign 1 $78.00 $78.00 12 traffic control sign 2 $59.22 $118.44 13 Street Trees 1 $250.00 $250.00 14 guardrail (or rebuild wall in right -of -w 0 ES @D$3700 0.0 ft $20.16 $0.00 15 manhole or drop inlet 2 $1,638.00 $3,276.00 16 pipe, rcp (15 to 48 ") 0.0 in d 0 ES -1,2 $250 0 EC -1 $200 200.0 ft $27.72 $5,544.00 17 pipe, rcp (54 to 72 ") 54.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $189.00 $0.00 18 pipe, pvc (4 to 10 ") 8.0 in d 0.0 ft $7.56 $0.00 19 pipe, cmp (15 to 48 ") 15.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $27.72 $0.00 20 pipe, cmp (54 to 72 ") 60.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $175.20 $0.00 21 rip -rap, placed 0.0 ton $37.80 $0.00 22 E &S fabric,EC -2,3 0 ft L 0 ft W 0.0 sy $12.60 $0.00 4/23/2009 Development Name Old Trail Phase 2, Block 4 Roads W P0200800106 ROAD Construction Bond Estimate (roads, site work, storm sewer) Item $54,754.21 contigency 25% $13,688.55 No. Unit Unit Cost Cost Number Phase "A" installed 23 clear and grub (for wooded sites) 0.0 ft L 0.0 ft W 0.0 acre $12,600.00 $0.00 24 grading (per cy for cut or import only; 600.0 cy fill 500.0 cy cut 600.0 cy $3.78 $4,158.00 24 CBR tests (1 every 0.1 mi. per road) 217.0 ft L 0.434 inc of 500' 2 $189.00 $283.50 25 as -built drawings (1 k + price per 0.1 217.0 ft L 0.041 mi. 1 $1,260.00 $2,260.00 26 survey and layout (price per 0.1 mi.) 217.0 ft L 0.041 mi. 1 $630.00 $1,630.00 27 mobilization 1 $630.00 $630.00 28 VDOT surety (1 lane) 217.0 ft L 0.041 mi. 2 Lanes $2,000.00 $1,643.94 29 VDOT maintenance fee (1 In rd, 1 yr) 217.0 ft L 0.041 mi. 2 Lanes $150.00 $123.30 30 VDOT admin. Cost recovery fee(1 Iar 217.0 ft L 0.041 mi. 2 Lanes $100.00 $332.20 cost sum $54,754.21 contigency 25% $13,688.55 Total $68,450 4/23/2009