Loading...
HomeMy WebLinkAboutARB200800168 Review Comments Final Site Plan and Comps. 2009-03-20ALg�,�� �'IRGINZ�` COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 March 20, 2009 Rick Ball Bradley & Ball Architects 5921 H West Friendly Ave. Greensboro, NC 27410 RE: ARB2008 -00168 Crown BMW Retail Parts & Service Building Tax Map 78, Parcels 15,15B & 15B1 Dear Mr. Ball: I have reviewed your recent submittal for the above - referenced project, which included a material sample for the dumpster gates and the following drawings with revision date of 3 -3 -09: A2.1, A2.2, C3, C4, CIO-13, C31, C32, RW6, and P1. I have the following comments: 1. Proposed trees have been deleted from the Route 250 frontage. Trees are required at 35' on center. Please revise the plan to show a consistent row of trees along the Route 250 frontage. 2. Based on the retaining wall details, there is approximately 2' of planting area between the retaining walls. (The site plan shows about 4'.) The Rhododendron that is proposed for the retaining walls grows up to 6' wide. I contacted Freeland & Kauffman and Kim Kauffman agreed that the Rhododendron was oversized for this space. Kauffman recommended a dwarf Buford holly instead. Since talking with Freeland & Kauffman, I have found several sources indicating that the dwarf Burford can grow to 6' x 6' or larger. Consequently, the drawings should be revised to provide an alternate shrub that will thrive in the available area at the retaining walls, or the planting area should be increased to accommodate the larger plants. 3. The display area is still not quite accurate. The southwesternmost display area shown on the plan exceeds the area that was previously approved. I have attached a sketch that shows the previously approved area. Revise the plans to show the correct display area and to delete "Existing Display Area" notes that are misplaced. 4. The lighting plan shows excessive spillover at the property line along Route 250. The portion of this spillover located east of the entrance to the site is caused by the existing "A" fixtures. Because the "A" fixtures are not being moved or replaced, that spillover can remain. However, there is also spillover in the entrance and west of the entrance. In these areas, spillover at the property line cannot exceed .5 footcandles. Please revise the lighting plan to correct this. I apologize for not catching this in the previous set of drawings. The current set of drawings is clearer and easier to read. 5. Please indicate what "ED 17" means for the WD light fixture. Also, please indicate where the color chosen for the light fixtures has been indicated in the plans. If the color hasn't already been included on the plans, please add it. Please provide: 1. One full set of revised drawings addressing each of these conditions. Include updated ARB revision dates on each drawing and an ARB approval signature panel. 2. A memo including detailed responses indicating how each condition has been satisfied. If changes other than those requested have been made, identify those changes in the memo also. Highlighting the changes in the drawing with "clouding" or by other means will facilitate review and approval. 3. The attached "Revised Application Submittal" form. This form must be returned with your revisions to ensure proper tracking and distribution. When staffs review of this information indicates that all conditions of approval have been met, a Certificate of Appropriateness may be issued. If you have any questions, please do not hesitate to contact me. Sincerely, Margret Maliszewski Principal Planner cc: Mike Craddock, Crown Automotive, 3633 C W. Wendover Ave., Greensboro, NC 27407 Baumgardner, Rickey Lee or Donna G., 1252 Still Meadow Ave., Charlottesville VA 22901 Bill Fritz (via email) File COUNTY OF ALBEMARLE Department of Community Development REVISED APPLICATION SUBMITTAL This form must be returned with your revisions to ensure proper tracking and distribution. County staff has indicated below what they think will be required as a resubmission of revisions. If you need to submit additional information please explain on this form for the benefit of the intake staff. All plans must be collated and folded to fit into legal size files, in order to be accepted for submittal. TO: Margaret Maliszewski DATE: PROJECT NAME: ARB2008 -00168 Crown BMW Retail Parts & Service Building Submittal Type Requiring Revisions ( ) indicates submittal code County Project Number # Copies Erosion & Sediment Control Plan (E &S) # Copies Distribute To: Mitigation Plan (MP) 1 Margaret Maliszewski Waiver Request (WR) Stormwater Management Plan (SWMP) Road Plan (RP) Private Road Request, with private /public comparison (PRR) Private Road Request — Development Area (PRR -DA) Preliminary Site Plan (PSP) Final Site Plan (or amendment) (FSP) Final Plat (FP) Preliminary Plat (PP) Easement Plat (EP) Boundary Adjustment Plat (BAP) Rezoning Plan (REZ) Special Use Permit Concept Plan (SP -CP) Reduced Concept Plan (R -CP) Proffers (P) Bond Estimate Request (BER) Draft Groundwater Management Plan (D -GWMP) Final Groundwater Management Plan (F -GWMP) Aquifer Testing Work Plan (ATWP) Groundwater Assessment Report (GWAR) Architectural Review Board (ARB) ARB2008 -168 Other: Please explain (For staff use only) Submittal Code # Copies Distribute To: Submittal Code # Copies Distribute To: ARB 1 Margaret Maliszewski