Loading...
HomeMy WebLinkAboutWPO200800081 Review Comments Bond Estimate 2008-11-17BOND ESTIMATE - EROSION CONTROL PROJECT NAME: Yordy Driveway PROJECT NUMBER: WPO200800081 DATE OF ESTIMATE: 10/7/08 ESTIMATE BY: ADP BASED ON: WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 1 1500 1500 SILT FENCE LF 600 5 3000 SAFETY FENCE LF 0 3 0 TEMPORARY FILL DIVERSION LF 0 3 0 DIVERSION DIKE LF 0 3 0 TEMPORARY SLOPE DRAIN LF 0 20 0 SEDIMENT TRAP 1 ACRES 0 1000 0 SEDIMENT BASIN 1 ACRES 0 1000 0 CULVERT INLET PROTECTION EA 0 500 0 INLET PROTECTION EA 4 200 800 OUTLET PROTECTION EA 5 200 1000 EC -2 & 3 DITCH PROTECTION LF 0 10 0 RIP -RAP LF 0 55 0 CHECK DAMS SQ.YD. 0 30 0 STREAM CROSSING TYPE I EA 0 1000 0 STREAM CROSSING TYPE II EA 0 3000 0 STREAM CROSSING TYPE III EA 0 5000 0 PAVED CONSTRUCTION ENTRANCE EA 1 2000 2000 SUBTOTAL 8300.00 CONTINGENCY & ADMINISTRATION LS 25% 2075.00 TOTAL 10375.00 BOND AMOUNT REQUIRED 10400.00