HomeMy WebLinkAboutSDP200900031 Review Comments Critical Slope Waiver 2009-05-04Page 1 of 1
Amy Pflaum
From: Amy Pflaum
Sent: Tuesday, March 24, 2009 3:50 PM
To: 'rburkholder@balzer.cc'
Subject: Collins Medical Center (Westfield)
Ray,
I was able get a determination from the Chief of Current Development on the validity of the previously approved
Critical Slopes Waiver on this site. The Critical Slopes Waiver, approved with SP200500033 by the Planning
Commission on March 14, 2006, will remain valid so long as the Final Site Plan which was approved on this site
does. The Final Site Plan (SDP200500136) was approved April 18, 2007, and is valid for 5 years from that date.
It is understood that the development you are proposing is different than the previously approved site plan,
however, if the disturbance to the critical slopes remains in general accord with the previously proposed
disturbance, then the waiver remains valid. This Critical Slopes Waiver was approved with the following
condition:
1. Peak rate and velocity of runoff shall be controlled to pre - development levels.
I would suggest that you print this email and submit it along with your preliminary site plan so that it is clear this
determination has been made.
Please let me know if I can answer any further questions.
Thank you,
Amy D. Pflaum
Senior Civil Engineer
Albemarle County Department of Community Development
(434) 296 -5832 x3069
apflaumgalbemarle. org
4/22/2009