Loading...
HomeMy WebLinkAboutSUB200800183 Review Comments Bond Estimate 2009-04-24Development Name ROAD Construction Bond Estimate (roads, site work, storm sewer) Item Item No. Unit Unit Cost Cost Number Belle Vista - Private Road Improvement (4/24/09) installed Road Nam Warm Blood Drive road length 556.0 ft 1 aggregate base 6.0 in d 556.0 ft L 14.0 ft W 144.1 cy $35.91 $5,176.36 2 blotted or prime &double seal 0.0 ft L 0.0 ft W 0.0 sy $6.30 $0.00 3 asphalt base 0.0 in d 0.0 ft L 0.0 ft W 0.0 tons $73.50 $0.00 4 asphalt surface 0.0 in d 0.0 ft L 0.0 ft W 0.0 tons $81.90 $0.00 6 curb CG -2 0.0 ft $8.40 $0.00 7 curb CG -6 0.0 ft $13.83 $0.00 8 sidewalk, asphalt 0.0 in d 0.0 ft L 0.0 ft W 0.0 tons $73.50 $0.00 9 sidewalk, concrete 4' width 0.0 ft $11.66 $0.00 10 ramp CG -12 0 $315.00 $0.00 11 street name sign 0 $65.00 $0.00 12 traffic control sign 0 $49.35 $0.00 13 guardrail (or rebuild wall in right -of -wa 0 ES @ $3700 0.0 ft $16.80 $0.00 14 manhole or drop inlet 0 $1,365.00 $0.00 16 pipe, rcp (15" to 48 ") 24.0 in d 2 ES -1,2 $250 0 EC -1 $200 105.6 ft $39.90 $4,713.44 17 pipe, rcp (54" to 72 ") 54.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $157.50 $0.00 18 pipe, pvc (4" to 10 ") 8.0 in d 0.0 ft $6.30 $0.00 19 pipe, cmp (15" to 48 ") 15.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $23.10 $0.00 20 pipe, cmp (54" to 72 ") 60.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $146.00 $0.00 21 rip -rap, placed 0.0 ton $31.50 $0.00 22 E &S fabric,EC -2,3 0 ft L o ft W 0.0 sy $10.50 $0.00 23 clear and grub (for wooded sites) 556.0 ft L 0.0 ft W 0.0 acre $10,500.00 $0.00 24 grading (per cy for cut or import only) 0.0 cy fill 0.0 cy cut 0.0 cy $3.15 $0.00 24 CBR tests (1 every 0.1 mi. per road) 556.0 ft L 1.112 inc of 500' 0 $157.50 $0.00 25 as -built drawings (1k+ price per 0.1 r 556.0 ft L 0.105 mi. 0 $1,050.00 $1,000.00 26 survey and layout (price per 0.1 mi.) 556.0 ft L 0.105 mi. 0 $525.00 $1,000.00 27 mobilization 0 $525.00 $0.00 28 VDOT surety (1 lane) 556.0 ft L 0.105 mi. 0 Lanes $2,000.00 $0.00 29 VDOT maintenance fee (1 In rd, 1 yr) 556.0 ft L 0.105 mi. 0 Lanes $150.00 $0.00 30 VDOT admin. Cost recovery fee(1 Ian 556.0 ft L 0.105 mi. 0 Lanes $100.00 $250.00 Cost sum $12,139.80 contigency 25% $3,034.95 Total 1 $15,200 4/24/2009