Loading...
HomeMy WebLinkAboutSDP200900017 Review Comments Minor Amendment 2009-05-01*—&A County of Albemarle Department of Community Development Memorandum To: Gerald Gatobu, Current Development Project Planner From: Phil Custer, Current Development engineering review Date: 1 May 2009 Subject: Humagen Minor Amendment (SDP- 2009 - 00017) The minor amendment for the Humagen Facility has been reviewed. Engineering review for Current Development can recommend approval to the minor amendment after the following comments have been addressed: 1. Critical slopes are disturbed with this application and this disturbance requires a waiver. These critical slopes were created with the construction of site plan SDP - 1996 -00030 and are likely not designated on the county's open space plan. Therefore, the disturbance shown in this plan is eligible to be waived by the Director of Current Development, unless the application is called up to the Planning Commission. Before the Director can waive such disturbance, the Zoning Ordinance requires the approval of an Erosion and Sediment Control Plan beforehand. Approval of an ESC plan will likely be a condition of Director's granting of the critical slope waiver. The engineering review of the critical slope waiver will be given in a separate document. (Rev. 1) Approval of the critical slope disturbance will be granted by the Chief of Current Development with the condition that an ESC plan is submitted and approved. 2. The parking lot should be graded in such a manner that no slopes steeper than 5%, other than in the transitional area at the entrance from the travelway, exist. This appears to be possible by moving the 468 contour line and still keeping the corner of the lot at 467. (Please see the sketch at the end of this memo.) (Rev. 1) Comment has been addressed. 3. The hatched area in the upper parking lot should be a curbed island. [18- 4.12.15.f] (Rev. 1) Comment has been addressed. 4. Please provide a note on the pipe profile stating that the contractor is to provide a concrete transition from the end - section to the bottom of the VDOT ditch. (Rev. I) Comment has been addressed. 5. VDOT approval is required for the proposed pipe outlet into public ROW. (Rev. 1) VDOT approval has not yet been received. Correspondence from VDOT will be forwarded to the applicant once it is received. 6. A WPO application and fee are required for the SWM and ESC plan review. (Rev. 1) A WPO application has not been submitted. The minor amendment should not be approved until the WPO plan is received and approved. The following are unofficial WPO plan comments that must be addressed with the WPO application. 1. The new drop inlet should be a DI -3A so that the Filterra hydraulics are more likely to work properly in the field. Spot elevations on the pavement at the throat of the Filterra and curb inlet should be provided. 2. Please specify the size of the Filterra. 3. An approval letter from Filterra is required. 4. The ESC plan required as a condition of the critical slope waiver must be a full plan including all applicable items in the design manual checklist. File: E2 _inia_PBC_sdp200900017_Humagen Minor Amendment.doc