Loading...
HomeMy WebLinkAboutWPO200800036 Review Comments Bond Estimate 2009-04-28BOND ESTIMATE - EROSION CONTROL Spreadsheet last revised:12 -5 -01 PROJECT NAME: Glenmore (Perimeter Road) PROJECT NUMBER: WPO200800036 DATE OF ESTIMATE: 04/27/09 ESTIMATE BY: MRG BASED ON: Approved plan WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 7 1500 10500 SILT FENCE LF 1000 5 5000 SAFETY FENCE LF 0 3 0 TEMPORARY FILL DIVERSION LF 0 3 0 DIVERSION DIKE LF 8500 3 25500 TEMPORARY SLOPE DRAIN LF 0 20 0 SEDIMENT TRAP 1 ACRES 2.7 1000 2700 SEDIMENT TRAP 2 ACRES 0.8 1000 800 SEDIMENT TRAP 3 ACRES 0.4 1000 400 SEDIMENT TRAP 4 ACRES 1.2 1000 1200 SEDIMENT TRAP 5 ACRES 2 1000 2000 SEDIMENT TRAP 6 ACRES 0.8 1000 800 SEDIMENT TRAP 7 ACRES 0.8 1000 800 SEDIMENT TRAP 8 ACRES 0.9 1000 900 SEDIMENT TRAP 9 ACRES 2.3 1000 2300 SEDIMENT BASIN 1 ACRES 0 1000 0 Utility Stream Crossing EA 0 1000 0 CULVERT INLET PROTECTION EA 0 500 0 INLET PROTECTION EA 1 200 200 OUTLET PROTECTION EA 1 200 200 EC -2 & 3 DITCH PROTECTION LF 5400 10 54000 RIP -RAP LF 0 55 0 CHECK DAMS SQ.YD. 0 30 0 PAVED CONSTRUCTION ENTRANCE EA 1 2000 2000 SUBTOTAL 109300.00 CONTINGENCY & ADMINISTRATION LS 25% 27325.00 TOTAL 136625.00 BOND AMOUNT REQUIRED 136700.00