Project: University Village, Phase 1; SDP - 2009 - 00033, WPO- 2009 -00020
Plan preparer: Mr. Scott Collins; Collins Engineering
Owner or rep.: Next Generation, LLC
Plan received date: 27 April 2009
Date of comments: 19 May 2009
Reviewer: Phil Custer
The final site and road plans for Phase 1 of the University Village Retirement Community project, received
on 27 April 2009, have received engineering review. The applicant has requested that the site plan be
reviewed under the Zoning Ordinance at the time of the rezoning approval (ZMA- 1977 -019). A separate
letter will be sent out at a later date with comments regarding the Erosion and Sediment Control and
Stormwater Management Plans.
A. Final Site Plan [SDP- 2009 - 00033]
1. Please show the benchmark in the plan set. [32.4.35]
2. The road crossing will require fill in the floodplain and, therefore, a special use permit will be
necessary. A site plan can not be approved for this project without the SP for fill in the floodplain.
[30.3]
3. All handicap parking spaces must be 12ft wide. [4.12.6.5]
4. The site plan shows disturbance to an undisturbed buffer on the rezoned commercial portion of the
property for the construction of a sewer line. Please request a waiver of this buffer and it will be
taken to the Planning Commission.
5. Please move the parking spaces and garages farther south so that the sidewalk along the road can
not be blocked by parked cars.
6. The pipe systems on the site plan sheets (S) and drainage plan sheets (DP) show different
alignment and networks. Please correct.
7. A drainage structure is needed on University Lane across from structure 50.
8. Please call out a VDOT Safety Slab for structure 113.
9. Please provide VDOT Inlet Shaping on all inlets where flow drops 4ft (either from a pipe or from
the surface).
10. On -grade curb inlet calculations appear to be incorrect. For every inlet, a longitudinal slope of
0.5% is used for the computation.
11. The site plan cannot be approved until all elements of the WPO plan are approved. Comments
regarding the ESC and SWM plans will be given in a separate letter.
12. This project is located outside the jurisdictional area for public water and sewer service but within
the development area boundary. The jurisdictional area is currently being updated by the Planning
Department.
B. Road Plan [WPO- 2009 - 00020]
1. VDOT approval is required.
2. A road bond must be posted prior to approval of the site plan. The applicant must provide an item
by item breakdown from a contractor for the construction of all public improvements. This cost
Current Development
Engineering Review Comments
Page 2 of 2
estimate will be subject to the review of the County Engineer. [32.5.2]
3. The radius of the cul -de -sac must be a minimum of 50ft. [32.5.9]
4. The pavement section details do not match for all roads between the individual detail and summary
table and the road cross section detail.
5. Please reduce the cut and fill for the roadway between Sta. 19 +00 and Sta. 28 +00 so that critical
slope disturbance is minimized. A waiver for critical slope disturbance will be required in areas
where critical slopes disturbance could be reasonably avoided if the start of the fill or cut was
brought closer to the right -of -way.
6. The crossing of the perennial stream must be designed at this time, preferably, in conjunction with
the review of a Special Use Permit. The crossing should be designed so that the plan is in
conformity with the approved rezoning plan; a lake should be created with the roadway fill unless
a variation is given by the Director of Planning. Future comments may be required on the road
plan due to changes necessary to meet crossing requirements.
7. University Village Circle and University Village Lane will likely have to be private roads due to
VDOT's current road acceptance requirements. The loop road was also called out as private in the
application plan.
8. The width of University Village Circle is called out as 24ft width in plan view and a 28ft width in
the section. Please correct. Either section is permissible. Please also provide the standard 6ft
planting strip and 5ft sidewalk section for University Village Circle.
9. Please provide centerline radii for all roads on sheets R -1, R -2, and R -3.
10. Please show easements on all pipes and culverts from VDOT ROW. Easement widths must meet
the standard described in the latest edition of the design manual. [32.5.12]
11. Please do not show in this plan set the possible future ROW for Boulders Road Extension or the
possible realignment of University Village Drive.