COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
MEMORANDUM
TO: Elizabeth M. Marotta, Senior Planner
FROM: Brent Nelson, Landscape Planner
RE: Design Planning comments on: SDP 2009 -18: Blue Ridge Shopping Center,
Major Site Plan Amendment
DATE: April 30, 2009
I have reviewed the Major Site Plan Amendment for the above referenced proposal including the following:
• Sheet A0: Cover Sheet, latest revision date March 20, 2009
• Sheet SP I: Site Plan, latest revision date April 23, 2009
• Sheet SP2: Site Plan, latest revision date April 14, 2008
• Sheet L1: Illumination Plan, latest revision date March 5, 2009
• Sheet L2: Light Fixtures, latest revision date March 5, 2009
• Sheet L1A: Bank Lighting Plan, date March 4, 2008
Outstanding issues that need to be addressed are as follows:
Issue: Lighting Plan
Comments: This latest submission included Sheets L1: Illumination Plan, L2: Light Fixtures, and L1A: Bank
Lighting Plan. Sheet L1 A: Bank Lighting Plan is not the lighting plan approved by the ARB. Lighting is not a
part of this amendment; therefore, these drawings should not be included in this submission.
Recommendations: Revise this application by removing lighting drawings L1: Illumination Plan, L2: Light
Fixtures, and L1A Bank Lighting Plan. Revise the Index of Sheets on Sheet AO accordingly.
Issue: BB &T Frontage Landscaping
Comments: Sheet SP2 Amended Site Plan does not reflect all of the Entrance Corridor frontage landscaping
approved for the BB &T bank proposed in the northwest corner of the shopping center.
Recommendations: Revise Sheet SP2 Amended Site Plan to include all of the planting required by the ARB for
the BB &T Bank in the northwest corner of the shopping center.