HomeMy WebLinkAboutSDP200800179 Review Comments Final Site Plan and Comps. 2009-01-29SUB - 2008 -179 Three Noth'd Center -Final
Summer Frederick
From: Denunzio, Joel D., P.E. [ Joel .Denunzio @VDOT.virginia.gov]
Sent: Thursday, January 29, 2009 2:00 PM
To: Summer Frederick
Cc: Amy Pflaum
Subject: SUB - 2008 -179 Three Noth'd Center -Final
SUB - 2008 -179 Three Noth'd Center -Final
Summer,
I have reviewed to above plan and have the following comments:
• Previous comments sent on May 1, 2008 have not been adequately addressed.
Page 1 of 1
• The proposed entrances need to be designed to the CG -11 standards, include profiles, and be a minimum 30
feet in width.
• The WP -2 standard needs to be shown for pavement widening.
• Drainage computations need to be included with the plan.
• The existing road includes all roadway features and sidewalk within the existing ROW. The new proposal needs
to replace the sidewalk and dedicate ROW to accommodate the new sidewalk. If an easement needs to be used instead
of ROW for the sidewalk only, a minimum of three feet of ROW needs to be dedicated behind the curb and a sidewalk and
clear zone easement must be provided to extend a foot behind the proposed sidewalk. A utility easement cannot be
shown for this purpose. However, it is highly preferred to have the sidewalk located in the ROW.
• The CG -12 detail needs to be updated to reflect the most current standards.
If you have any questions, please let me know.
Thanks,
Joel
Joel DeNunzio, P.E.
Staff Engineer
434 - 293 -0011 Ext. 120
joel.denunzio @vdot.virginia.gov