COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project: Saint Anne's Beliield; Minor Site Plan Amendment [SDP200900037]
Plan preparer: Mr. Kurt Gloeckner, PE
Owner or rep.: Saint Anne's Beliield
Plan received date: 7 May 2009
Date of comments: 9 June 2009
Reviewer: Phil Custer
1. Please provide a detail for the retaining wall. The retaining wall detail should include a handrail
and a note stating that for any portion of the wall taller than 4ft, a handrail will be required.
2. Should the spot elevation in the southeast corner of the artificial field be 637? The crown and
longitudinal pitch of the field appear to be between 0.46% and 0.48% except for the slopes to the
point in the southeast corner.
3. The cleanout detail on sheet 4 shows the pipe exposed on the playing surface. Please clarify.
4. The County has refined its policy on artificial turf fields. The conversion of the grass to artificial
turf increases the overall imperviousness of the site, so water quality and quantity control is a
concern. Though, after evaluating the existing stormwater system, engineering review believes
that water quantity control is not an issue considering the detention within in the existing
downstream biofilter, underground pipe, and even within the underdrain system of the new field.
However, water quality concerns still exist. The applicant should submit a WPO plan showing
water quality treatment of the runoff from the artificial field. Water quality computations should
be made considering the artificial field as gravel (70% imperviousness).
Alternatively, in lieu of providing treatment within a facility, the applicant may commit to water
quality monitoring of the runoff from the artificial field. The frequency and location of the water
quality sampling should be determined by a qualified individual with experience in water quality
analysis. Results and analysis of the raw data should be provided to the county every three months
after construction of the field for a period of one year.