Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO200800088 Review Comments Bond Estimate 2009-09-21 (3)
BOND ESTIMATE - EROSION CONTROL PROJECT NAME: PROJECT NUMBER: DATE OF ESTIMATE ESTIMATE BY: BASED ON: JW Townsend W PO- 2008 -00088 09/21/09 PBC Plans signed 9/14/09 WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 4.1 1500 6150 SILT FENCE LF 540 5 2700 DIVERSION DIKE LF 210 3 630 SEDIMENT BASIN 1 ACRES 5.27 1000 5270 CULVERT INLET PROTECTION EA 2 500 1000 OUTLET PROTECTION EA 3 200 600 RIP -RAP LF 40 55 2200 PAVED CONSTRUCTION ENTRANCE EA 1 2000 2000 SUBTOTAL 20550.00 PROJECT MANAGEMENT LS 15% 3082.50 SUBTOTAL 23632.50 CONTINGENCY 10% 2363.25 TOTAL 25995.75 BOND AMOUNT REQUIRED 26000.00 last revised:12 -5 -01