Loading...
HomeMy WebLinkAboutSDP200900041 Review Comments Final Site Plan and Comps. 2009-06-05�F ALBz , �'IRGINI�' COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 June 5, 2009 Gate Pratt Limehouse Architects 946 Grady Avenue Charlottesville, VA 22903 RE: ARB- 2008 -139: Georgetown/Hydraulic Office Building (Tax Map 60F, Parcel 3) Dear Mr. Pratt: Fax (434) 972 -4012 I have reviewed your revised submittal for the above - referenced project which consisted of the following: Drawings: Sheet Cover Sheet, latest revision date 4/28/09 Sheet C -1 Engineers Cover Sheet, latest revision date 9/15/08 Sheet C -2 Existing Conditions & Final Site Plan, latest revision date 9/15/08 Sheet C -3 Landscape Plan, latest revision date 9/15/08 Sheet C -4 Lighting Plan, latest revision date 9/15/08 Sheet C -4a Lighting Plan Cut Sheets, latest revision date 9/15/08 Sheet C -5 Erosion Control Plan, latest revision date 9/15/08 Sheet Al Plan, latest revision date 4/28/09 Sheet A2 Plans, latest revision date 4/28/09 Sheet A3 Elevations, latest revision date 4/28/09 Sheet A3a Elevations w / Landscape, latest revision date 4/28/09 Sheet A4 Elevations /Section/Details, latest revision date 4/28/09 Sheet A5 Elevation/Section, latest revision date 4/28/09 Sheet A5a Elevation w / Landscape, latest revision date 4/28/09 Sheet A6 Elevations /Section/Details, latest revision date 4/28/09 Sheet A7 Section/Details, latest revision date 4/28/09 Sheet A8 Details, latest revision date 4/28/09 Material s Sentriclad Architectural Metals `Classic Green' Flamenco Brixment `Antique W hite' C -443 Lawrenceville Brick `Monticello' Outstanding issues that will need to be further addressed are shown in italics after the original comment from the Action Letter of November 7, 2008. Revise the cast stone to be more similar to the almond C73 mortar submitted. Revise the building elevation drawings to clearly indicate the use of Lawrenceville Brick "Monticello" for the building fagade. Comments: In this latest submission, the cast stone was not revised to be more similar to the Almond C73 mortar as outlined in the Action Letter. The applicant is still proposing the "Dark Buff Limestone" previously reviewed. In this resubmission, the applicant is proposing to revise the mortar type to Flamingo Brixment "Antique White". At the June 1, 2009 ARB meeting, staff asked the Board for direction concerning this issue. In consensus, the ARB offered: Regarding the mortar /cast stone color for Georgetown @ Hydraulic, it was the consensus of the ARB that the proposed Flamingo Brixment "Antique White" could be approved with the cast stone previously reviewed with the caveat that a sample panel be provided on -site for final review. The applicant is further encouraged to consider lightening the mortar color further to match the cast stone color more closely. Recommendations: Provide a sample panel of the proposed Lawrenceville Brick "Monticello" with the proposed mortar Flamingo Brixment "Antique White" on -site for review and approval by the ARB.. Consider lightening the mortar color further to match the cast stone color more closely. The Certificate of Appropriateness approval will not be issued until the Board has reviewed and approved this on -site sample. 6. Revise the lighting plan to include the proposed lighting cut sheets, illustrating the fixture and placement of the bulb, within the set of full size site plan/lighting plan drawings. Revise the luminaire schedule to include the finish and color of all proposed light poles. Assuming they are full cutoff fixtures, the Board prefers the ELA Georgetown over the Belle Chase fixture. Comments: On Sheets C4 and C4 -A in this latest submission, the applicant is proposing the use of ELA brand Fixture B a lantern style fixture with a 100 watt metal halide bulb. This is not a full cut off style fixture and therefore must be under the 3,000 lumens threshold that requires a full cutoff fixture. A 40 watt metal halide bulb emits 3,000 lumens. On Sheet C -4 "Lighting Plan" the lighting footcandle values shown along the Hydraulic Road right -of -way exceed the 0.5 footcandle permitted at a public right -of -way. A lighting cutsheet illustrating the appearance of the wall fixture proposed for the building signage was not included with this submission. Recommendations: Revise the proposal by reducing the wattage of the ELA Fixture B, lantern style fixture, to show the use of a bulb that emits less than 3,000 lumens or revise the fixture to one that is a true full cutoff style. Revise the photometric plan to show a maximum 0.5 footcandle at the Hydraulic and Georgetown rights -of -way. Revise Sheet C -4A "Lighting Cut Sheets" to include a cutsheet that clearly illustrates the appearance of the proposed wall fixture for the building signage. 8. Provide a sample of the brick pavers for review. Revise the drawings to confirm that pavers will be dry set. Comments: Sheet C -2 "Existing Conditions and Final Site Plan" does not indicate if the 3 five foot wide sidewalks leading to the building will be dry set. Recommendations: Revise Sheet C -2 "Existing Conditions and Final Site Plan" to indicate that the 3 five foot wide sidewalks leading to the building will be dry set. 10. For a work session provide: rake details for the front entry gables and end gables; additional detail for the tower, front and side elevations, including brick detail around the arched window and circular louvered vents; window frame, sash and muntin details; along with any trim surrounds anticipated for all openings. Confirm window and trim colors. Revise proportions of cornice to reflect classical proportions. Coordinate the cornice details on Sheet A6. Comments: The Action Letter of 1215108, following the 1211108 Work Session, states Sheets A3, A4. and A6 with the latest revision date of November 25, 2008 and Sheet A8 dated November 25, 2008 can be approved. That revision date is not reflected on the drawings included in this submission. Recommendations: Verify that the same drawings approved in the Work Session of 1211108 are included in this submission. If they are, revise the revision dates listed to include the revision dates referenced in the Action Letter of 1211108. Please provide: 1. Two copies of revised drawings addressing the aforementioned comments. 2. A memo indicating specifically how the condition has been satisfied. If changes other than those requested have been made, specifically identify those changes in the memo, also. "Clouding" requested changes (information) will facilitate the review of your submittal. All requested information is to be shown on the sheets in the site plan package. 3. The attached "Revised Application Submittal" form. This form must be returned with your revisions to ensure proper tracking and distribution. When staff s review of this information indicates that all conditions of approval have been met, a Certificate of Appropriateness may be issued. If you have any questions, please do not hesitate to contact me. Sincerely, Brent W. Nelson Landscape Planner cc: ARB File COUNTY OF ALBEMARLE Department of Community Development REVISED APPLICATION SUBMITTAL This form must be returned with your revisions to ensure proper tracking and distribution. County staff has indicated below what they think will be required as a resubmission of revisions. If you need to submit additional information please explain on this form for the benefit of the intake staff. All plans must be collated and folded to fit into legal size files, in order to be accepted for submittal. TO: Brent Nelson DATE: PROJECT NAME: ARB- 2008 -139: Hydraulic at Georgetown Building Submittal Type Requiring Revisions ( ) indicates submittal Code County Project Number # Copies Erosion & Sediment Control Plan (E &S) # Copies Distribute To: Mitigation Plan (MP) 2 Brent Nelson Waiver Request (WR) Stormwater Management Plan (SWMP) Road Plan (RP) Private Road Request, with private /public comparison (PRR) Private Road Request — Development Area (PRR -DA) Preliminary Site Plan (PSP) Final Site Plan (or amendment) (FSP) Final Plat (FP) Preliminary Plat (PP) Easement Plat (EP) Boundary Adjustment Plat (BAP) Rezoning Plan (REZ) Special Use Permit Concept Plan (SP -CP) Reduced Concept Plan (R -CP) Proffers (P) Bond Estimate Request (BER) Draft Groundwater Management Plan (D -GWMP) Final Groundwater Management Plan (F -GWMP) Aquifer Testing Work Plan (ATWP) Groundwater Assessment Report (GWAR) Architectural Review Board (ARB) ARB2008 -89 Other: Please explain (For staff use only) Submittal Code # Copies Distribute To: Submittal Code # Copies Distribute To: ARB 2 Brent Nelson