HomeMy WebLinkAboutWPO200900028 Review Comments Erosion Control Plan 2009-06-30� OF AL
,. vIRGI1`IZP
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project: North Fork Regional Pump Station [SDP200900046, WP02009000281
Plan preparer: Charles Luck P.E. [cluck @wrallp.com]
Owner or rep.: University of Virginia Foundation
Plan received date: 8 June 2009
Date of comments: 30 June 2009
Reviewer: John P. Diez — Current Development - Engineering Technician
A. Final site plan (SDP200900046)
1. Please provide VDOT designations for the proposed guardrails by the entrance. [18- 32.7.2]
2. All entrances must show VDOT designations (PE -1, CG -9a, etc.)
3. VDOT approval must be obtained by any plan affecting public right -of -way.
4. The length of the turn and taper lane seems to be less than the required 144' for the 12' wide lane.
5. Please provide updated Albemarle County general construction notes. Please refer to the Design
Standards Manual.
6. There appears to be a king of lining on the north side of the entrance. Please label it and include it
in the limits of disturbance.
B. Erosion Control Plan (WP0200900028)
7. Please provide updated County erosion control notes. Please refer to the Design Standards Manual.
Once these comments have been addressed, please submit two (2) copies of the revised plans, calculations,
and narratives to Current Development Engineering.
Current Development Engineering is available from 2:30pm — 4:00pm on Thursdays to discuss these
review comments. Please contact Amy Pflaum at 434 - 296 -5832 or apflaum @albemarle.org to schedule an
appointment.
If you have any questions, you can reach me, John Diez, at (434) 296 -5832 ext. 3025, or my email:
jdiez@albemarle.org.
\\ Cob- dts01 \cityviewlnk\Docs \2009 \SDP \SDP200900046 North Fork Regional Pump Station - Final \CDE1 -
fsp,esc,swm_JPD_North Fork Regional Pump Station.doc