Loading...
HomeMy WebLinkAboutSUB200900064 Review Comments Bond Estimate 2009-06-10Development Name Berkshire Landing ROAD Construction Bond Estimate (roads, site work, storm sewer) Item Item No. Unit Unit Cost Cost Number SDP200900064 installed North Berkshire Road Extens 12 +01.39 to 15 +2; road length 322.1 ft 1 aggregate base 6.0 in d 322.1 ft L 30.0 ft W 179.0 cy $43.09 $7,711.79 2 blotted or prime &double seal 0.0 ft L 30.0 ft W 0.0 sy $7.56 $0.00 3 asphalt base 0.0 in d 322.1 ft L 30.0 ft W 0.0 tons $88.20 $0.00 4 asphalt surface 2.0 in d 322.1 ft L 30.0 ft W 90.2 tons $98.28 $8,864.50 6 curb CG -2 0.0 ft $10.08 $0.00 7 curb CG -6 644.3 ft $16.59 $10,690.98 8 sidewalk, asphalt 0.0 in d 322.1 ft L 4.0 ft W 0.0 tons $88.20 $0.00 9 sidewalk, concrete 4' width 0.0 ft $13.99 $0.00 10 ramp CG -12 0 $378.00 $0.00 11 street name sign 0 $78.00 $0.00 12 traffic control sign 0 $59.22 $0.00 13 guardrail (or rebuild wall in right -of -wa 0 ES @ $3700 0.0 ft $20.16 $0.00 14 manhole or drop inlet 0 $1,638.00 $0.00 16 pipe, rcp (15 to 48 ") 15.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $27.72 $0.00 17 pipe, rcp (54 to 72 ") 54.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $189.00 $0.00 18 pipe, pvc (4 to 10 ") 8.0 in d 0.0 ft $7.56 $0.00 19 pipe, cmp (15 to 48 ") 15.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $27.72 $0.00 20 pipe, cmp (54 to 72 ") 60.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $175.20 $0.00 21 rip -rap, placed 0.0 ton $37.80 $0.00 22 E &S fabric,EC -2,3 0 ft L 4 ft W 0.0 sy $12.60 $0.00 23 clear and grub (for wooded sites) 322.1 ft L 30.0 ft W 0.0 acre $12,600.00 $0.00 24 grading (per cy for cut or import only) 600.0 cy fill 500.0 cy cut 600.0 cy $3.78 $2,268.00 24 CBR tests (1 every 0.1 mi. per road) 322.1 ft L 0.644 inc of 500' 2 $189.00 $321.30 25 as -built drawings (1k+ price per 0.1 r 322.1 ft L 0.061 mi. 1 $1,260.00 $1,260.00 26 survey and layout (price per 0.1 mi.) 322.1 ft L 0.061 mi. 1 $630.00 $630.00 27 mobilization 1 $630.00 $630.00 28 VDOT surety (1 lane) 0.0 ft L 0 mi. 0 Lanes $2,000.00 $0.00 29 VDOT maintenance fee (1 In rd, 1 yr) 0.0 ft L 0 mi. 0 Lanes $150.00 $0.00 30 VDOT admin. Cost recovery fee(1 Ian 0.0 ft L 0 mi. 0 Lanes $100.00 $0.00 cost sum $32,376.57 contigency 25% $8,094.14 Total 1 $40,500 6/10/2009