Loading...
HomeMy WebLinkAboutSDP200800086 Review Comments Road Plan and Comps. 2009-07-09WPO- 2008 -00086 Willow Glenn Contech Bridge History Amy Pflaum From: DeNunzio, Joel D., P.E. [Joel .DeNunzio @VDOT.virginia.gov] Sent: Thursday, July 09, 2009 10:01 AM To: Amy Pflaum Subject: WPO- 2008 -00086 Willow Glenn Contech Bridge History WPO- 2008 -00086 Willow Glenn Contech Bridge History Amy, Page 1 of 1 We have reviewed the justification for a three sided structure proposed as part of the Willow Glenn development. VDOT has found the justification to be acceptable and will accept the structure for state maintenance at the time that the roads within the development meet the requirements for service in accordance with the 2005 Subdivision Street Requirements. Please let the engineer know that the Scour and Hydraulic Analysis will be required to be submitted in accordance with VDOT's Hydraulic Design Advisory HDA 06 -02. This data will need to be reviewed and approved by the Culpeper District Bridge Engineer and the District Hydraulics Engineer. Please let me know if you have any questions. Thanks Joel Joel DeNunzio, P.E. Staff Engineer 434 - 293 -0011 Ext. 120 joel.denunzio @vdot.virginia.gov 7/14/2009