Loading...
HomeMy WebLinkAboutSP200800035 Review Comments Special Use Permit 2009-07-15COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 July 15, 2009 Tim Keeney Keeney & Company Architects, PLC 1413 Sachem Place, Suite One Charlottesville, VA 22901 RE: SP2008-35, First Baptist Church Covesville Dear Mr. Keeney: Thank you for your recent application for a special use permit to construct a parking lot and new sanctuary next to an existing church. The members of the County's Site Review Committee have reviewed the development proposal resubmitted on June 15, 2009 and referenced above. Comments are included below. Planning Division The applicant is seeking approval to construct an approximately 3,200 square foot sanctuary 34' east of an existing church. The new sanctuary would mirror the existing church, and the entrance porches would be connected by a covered breezeway. The existing sanctuary seating would be relocated to the new sanctuary, and the old church would be used as a fellowship hall, with Sunday School classrooms and offices in the basement. The proposed development would not increase the maximum number of 180 seats in the sanctuary allowed by the current Special Use Permit, and no day-care, after-school program, or kitchen facility is proposed. A new paved parking area is also proposed in front of the church. The proposed parking would be able to accommodate 37 parking spaces, as opposed to the current 29 informal parking gravel spaces east of the existing church. The new sanctuary would not represent an increase in intensity in the use of the site and would serve to support existing activities more efficiently. The Rural Areas Section of the Comprehensive Plan includes the achievement, maintenance, and improvement of rural land patterning. Part of this vision includes the support of agricultural and forestal communities through community meeting places, at rural scales, that provide the opportunity to take part in community life. Division of Zoning and Current Development A site plan will be required. Show on the concept plan an overflow parking area for peak events, such as weddings. Access over, or parking over the drainfield should be discussed with the Health Department as it may cause damage to the drainfield. As the proposed new sanctuary would visually impact the neighboring property owner to the east, existing and proposed landscaping should be shown along the east edge of the parcel at this time. Landscaping at a rate of 1 tree for each 10 parking spaces will be required. Remove SP 2008-035, First Baptist Church Covesville 2 "Approved New" to the 25 ft setback reference on the concept plan, and show the western property line. The note about an iron being removed is confusing and should be removed from the concept plan. No building height for the sanctuary is provided. The setback increases 2 feet for every 1 foot that the building is over 35 feet tall. County Engineer A stormwater management plan and erosion control plan will be required. It is unlikely that this private lane will meet the private road requirements, which are equivalent to public road requirements for an institutional use. The drop inlet proposed in the area of the existing drainfield will not be approvable during the site plan review; hence the applicant may wish to relocate the drop inlet at this time. Architectural Review Board No objection. Inspections Division No objection. Health Department The 6' x 6' manhole over the distribution box is sufficient enough to allow access to the box. The concept plan shows paved parking proposed over the drainfield, which would require at least 28" of soil cover over the gravel and underneath the paving. Comments from each reviewer reflect information available at the time the development proposal was reviewed, and should not be considered final. However, the Site Review Committee has attempted to identify all issues which could effect approval of the proposed project. A copy of the re -submittal schedule is enclosed. It is important to submit all of the information/changes at the same time. Please provide one reduced size plan (11" X 17") and nine (9) full-sized copes of the Concept Plan and nine (9) copies of any correspondence. The receptionist in the Community Development Department will date and stamp the materials and forward them to me for distribution. Please note that the date of the resubmittal will determine the public hearing schedule. If you need additional information or need to discuss any of these comments, please give me a call at 434- 296-5823 x3029. Sincerely, Eryn Brennan Senior Planner Cc: File