Loading...
HomeMy WebLinkAboutSDP200900048 Review Comments No Submittal Type Selected 2009-06-30II COMMONWEALTH of VIRC NIA DEPARTMENT OF TRANSPORTATION CHARLOTTESVILLE RESIDENCY OFFICE 701 VDOT WAY CHARLOTTESVILLE, VA 22911 DAVID S. EKERN, P.E. COMMISSIONER June 29, 2009 Mr. Glenn Brooks Department of Engineering and Development 401 McIntire Rd. Charlottesville, VA 22902 Subject: Site Review Meeting Comments July 2nd, 2009 site review meeting Dear Mr. Brooks: Below are VDOT's comments on the Site Plans for the July 2nd, 2009 Site Review Committee Meeting: SDP - 2009 -00047 Wilcohess —Final (Summer Frederick) 1. A fueling position is defined in the ITE Trip Generation Manual as the number of vehicles that can be fueled simultaneously. The existing situation for trip generation shows 14 fueling positions but it appears that only 8 or 10 vehicles can fuel simultaneously. This will decrease the existing trip generation to 1628 VPD assuming there are 10 fueling positions. The new proposal shows ITE trip generation at 4340 VPD. This is an increase of 2712 VPD which is above the amount of traffic necessary for a Chapter 527 Traffic Impact Study. 2. This site currently is served by two entrances that neither meets the existing entrance standards or the Access Management Regulation spacing standards for commercial entrances. 3. This commercial entrance permit needs to be reevaluated in accordance with The Land Use Permit Manual, 24VAC30- 150 -1680. The increase in traffic volume will require this entrance to be brought to standard to retain the commercial entrance permit. A new entrance will need to be shown and should be located as indicated in the Places 29 plan. The entrance also needs to accommodate access for the adjacent properties in accordance with the requirements of 24VAC30 -72 -120, Commercial Entrance Access Management. WE KEEP VIRGINIA MOVING 4. Recommend that the minimum standards for entrances and access management being adequately addressed as a condition of the site plan approval. SDP - 2009 -00048 Stonewater Townhomes Site Plan -Final (Elizabeth Marotta) 1. The access is on a proposed private road of the subdivision and does not require permitting from VDOT. SUB- 2009 -00088 Peter Jefferson Overlook, LLC -Final (Summer Frederick) 1. The existing 30 foot easement to Lot 1 should be evaluated for it's adequacy to serve the proposed use in order to avoid the need for access to Route 250. Access to route 250 for Lot 1 may be in conflict with the Access Management Regulations. Please request the applicants provide a written description of revisions with re- submissions. If you have any questions or comments, please contact me prior to sharing these comments with the applicants. Sincerely, Joel DeNunzio, P.E. Staff Engineer VDOT Charlottesville Residency 434 - 293 -0011 WE KEEP VIRGINIA MOVING