Loading...
HomeMy WebLinkAboutWPO200900031 Review Comments Erosion Control Plan 2009-07-24OF AL O ,. vIRGI1`IZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Plan preparer: Owner /Applicant: Plan received date: Date of comments: Reviewer: A. Road Plan Little Yellow Mountain [WP0200900031 ] Kirk Hughes and Associates [email: rob @khals.net] Bowen, Richard H or Joan C 22 June 2009 24 July 2009 John P. Diez — Engineering Technician 1. Please provide updated Albemarle County General Construction notes. Please refer to the Design Standards Manual. B. Stormwater Management Plan 2. Please provide Albemarle County General Stormwater notes and General Construction Notes for Streets. Please refer to the Design Standards Manual. 3. Please revise the acreage in the drainage divide sheet. One is 0.1 (where it should be 0.01) and the other is 0.3 (where it should be 0.03) C. Erosion and Sediment Control Plan 4. Please provide Albemarle County Erosion Control notes. Please refer to the Design Standards Manual. 5. To facilitate drainage to a sediment trap (as required); please relocate the construction entrance to the other side of the bridge. 6. Please provide dust control (DC). 7. Please provide culvert inlet protection (CIP) to all culvert inlets. 8. Please provide outlet protection (OP) to all culvert outlets. Once these comments have been addressed, please submit two (2) copies of the revised plans, calculations, and narratives to Current Development Engineering. Current Development Engineering is available from 2:30pm — 4:00pm on Thursdays to discuss these review comments. Please contact Amy Pflaum at 434 - 296 -5832 or apflaum @albemarle.org to schedule an appointment. \\ Cob- dts01 \cityviewlnk\Docs \2009 \WPO \WPO200900031 Little Yellow Mountain \CDE1_esc_smw_JPD_Little Yellow Mountain.doc