Project:
Lewis & Clark Exploratory Center [SDP200900007 & WP02009000061
Plan preparer:
Timothy Miller, PE; Dominion Development Resources
[email: unknown]
Owner /Applicant:
City of Charlottesville & County of Albemarle
Plan received date:
27 January 2009
Rev. 1:
14 May 2009
Rev. 2:
2 July 2009
Date of comments:
13 March 2009
Rev. 1:
4 June 2009
Rev. 2:
23 July 20, 2009
Reviewer:
John P. Diez — Engineering Technician
A. Final Site Plan
1. Please provide date of topography. [18- 32.6.6, 14 -302, Policy for date]
(Rev. 1) Comment has been addressed.
2. Please specify that all proposed slopes steeper than 3:1 have low maintenance (not grass) ground
cover on the plans.
(Rev. 1) Comment has been addressed.
3. We are unable to locate details or specifications on the dumpster pad.
(Rev. 1) Comment has been addressed.
4. All existing and proposed grades must be labeled at each 50' station point.
(Rev. 1) Comment has been addressed.
5. Culvert pipe sizes on the profiles do not match those of the plans.
(Rev. 1) Comment has been addressed.
6. Please provide Albemarle County general construction notes for streets. Please refer to the Design
Standards.
(Rev. 1) Comment has been addressed.
7. Between stations 20 +50 and 21 +00 on the travelway profile, there is a change in grade with no
label or vertical curve.
(Rev. 1) Comment has been addressed.
8. Horizontal stationing and vertical stationing do not appear to align. Please see location of culvert
«A„
(Rev. 1) Comment has been addressed.
B. Stormwater Management Plan
9. SCC channel designations on sheet S4 do not correspond with sheet S9 and the calculations.
(Rev. 1) Comment has been addressed.
10. Water Quality Swale #1 should be designed as two swales, with one portion receiving the flow
from SCC #4 and the other from SCC #5, #6, and #7. Please submit the required Water Quality
Volume versus the volume provided in each swale.
(Rev. 1) Comment has been addressed.
Albemarle County Community Development
Engineering Review Comments
Page 2 of 3
11. The hatching types to designate the channel lining are not being used consistently.
(Rev. 1) Comment has been addressed.
12. Please address MS -19 issues in the outlet for Culvert "C ".
(Rev. 1) Comment has not been addressed. Provide calculations for Culvert "C" to show that no
erosion will occur on a 2-year storm.
(Rev. 2) Based on further review, please disregard this comment.
13. Impervious calculations for Water Quality Swale #2 do not include the drainage area for SCC #1.
Water Quality Volume appears inadequate.
(Rev. 1) Comment has been addressed.
14. Please provide Albemarle County general stormwater notes.
(Rev. 1) Comment has been addressed.
15. A completed copy of the Standard Stormwater Management Maintenance Agreement and fee for
recordation for the stormwater facilities required prior to final approval. [17 -304E] The forms and
instructions can be found on the Community Development Department website on
www.albemarle.org.
(Rev. 1) Comment has not been addressed.
16. While conducting a recent site visit, it appears that the end sections for existing culverts "B" and
"C" must be replaced.
(Rev. 2) Based on further review, comment to be discarded.
C. Erosion and Sediment Control Plan
17. Please provide the correct detail for drop inlet protection.
(Rev. 1) Comment has been addressed.
18. Construction entrance must drain to a sediment trap or sediment basin.
(Rev. 1) Comment has not been addressed.
(Rev. 2) Based on further review, please disregard this comment.
19. Please provide temporary and permanent seeding symbols (TS, PS)
(Rev. 1) Comment has been addressed.
20. While conducting a recent site visit, it appears that the outlet protection for existing culvert "C"
needs to be repaired.
!Rev. 2) Based on further review, comment has been addressed..
Once these comments have been addressed, please submit two (2) copies of the revised plans, calculations,
and narratives to Current Development Engineering.
Current Development Engineering is available from 2:30pm — 4:OOpm on Thursdays to discuss these
review comments. Please contact Amy Pflaum at 434 - 296 -5832 or apflaum @albemarle.org to schedule an
appointment.
Albemarle County Community Development
Engineering Review Comments
Page 3 of 3
\\ Cob- dts01 \cityviewlnk\Docs \2009 \SDP \SDP200900007 Lewis & Clark Exploratory Center\E3_fsp,swm,esc_JPD_Lewis &
Clark Exploratory Center.doc