Loading...
HomeMy WebLinkAboutWPO200900026 Review Comments Erosion Control Plan 2009-07-24� OF AL ,. vIRGI1`IZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Old Trail Phase VIII (Block 2) Plan preparer: Collins Engineering [fax (434) 245 -0300] Owner or rep.: March Mountain Properties, LLC [fax (434) 245 -0300] Plan received date: 10 July 2009 Date of comments: 24 July 2009 Reviewer: Max Greene The plans for Old Trail Phase VIII (Block 2) submitted on 10 July 2009 have received Engineering review. The following items will be adequately addressed prior to Final approval: A. Stormwater Management and Mitigation Plan (WP0200900026) 1. A completed copy of the standard stormwater maintenance agreement and fee for recordation for any stormwater management facilities will be submitted and approved/recorded prior to Final approval. [ 17 -304E] 2. Pro -rated share payment for this site is $7168.95 as will be posted prior to final approval. [ 17 -316] Once these comments have been addressed, please submit 2 copies of the revised E &SC and SWM plans, calculations, and narratives to Current Development Engineering. The E &SC bond amount is $45,700.00. The SWM bond amount is $79,100.00. The forms and instructions to post the Water Protection Ordinance Bond can be found on the Community Development Department Web site on www.albemarle.org. You may contact Pam Shifflett (Albemarle County Department of Community Development) at ext. 3246 for further information on bonding procedures and Maintenance Agreements. Once the Final site plan is approved and the E &SC bond and the SWM bond have been posted, you may contact the Department of Community Development to arrange a pre - construction meeting with a County Erosion & Sediment Control Inspector. Should the County Inspector find the limits of disturbance increased or the need for additional control measures required to protect the site, additional fees will be required. File: CDE2_rp,esc,swm,fsp_MRG_0ld Trail Phase VIII (Block 2).doc