Loading...
HomeMy WebLinkAboutSDP200900027 Review Comments Final Site Plan and Comps. 2009-07-07FW: SDP - 2008 -175 St. David's Anglican Church - Preliminary Summer Frederick From: DeNunzio, Joel D., P.E. [ Joel .DeNunzio@VDOT.virginia.gov] Sent: Tuesday, July 07, 2009 1:56 PM To: Summer Frederick Cc: Amy Pflaum Subject: FW: SDP - 2008 -175 St. David's Anglican Church - Preliminary Summer, Page 1 of 1 Justin Shimp hand delivered a set of the St. David's Anglican Church —final to me for review. I reviewed the plan and have no comments. Please let the applicant know that after they receive approval from the county, they will need to get a Land Use Permit for any construction within the existing road right of way. Thanks Joel Joel DeNunzio, P.E. Staff Engineer 434 - 293 -0011 Ext. 120 joel.denunzio @vdot.virginia.gov From: Denunzio, Joel D., P.E. Sent: Tuesday, February 24, 2009 11:30 AM To: 'Summer Frederick' Cc: 'Amy Pflaum' Subject: SDP - 2008 -175 St. David's Anglican Church - Preliminary Summer, I have reviewed the above site plan and the revisions and have one comment: • The entrance needs to be the same type and depth of pavement as the roadway, route 1001, which is a hard surfaced road. This pavement design needs to at least be constructed to the ROW line but it is recommended that it be extended at least 25 feet from the edge of the existing pavement. If you have any questions, please let me know. Thanks Joel Joel DeNunzio, P.E. Staff Engineer 434 - 293 -0011 Ext. 120 joeI.denunzio@vdot.virginia.gov 7/13/2009