Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO200900006 Review Comments Bond Estimate 2009-07-23
BOND ESTIMATE - EROSION CONTROL PROJECT NAME: LEWIS & CLARK EXPLORATORY CENTER PROJECT NUMBER: WPO200900006 DATE OF ESTIMATE: 07/22/09 ESTIMATE BY: JPD BASED ON: WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 9.65 $1,500.00 $14,475.00 SILT FENCE LF 1796 $5.00 $8,980.00 SAFETY FENCE LF 0 $3.00 $0.00 TEMPORARY FILL DIVERSION LF 0 $3.00 $0.00 DIVERSION DIKE LF 2120 $3.00 $6,360.00 TEMPORARY SLOPE DRAIN LF 0 $20.00 $0.00 SEDIMENT TRAP 1 ACRES 6.64 $1,000.00 $6,640.00 SEDIMENT BASIN 1 ACRES 0 $1,000.00 $0.00 CULVERT INLET PROTECTION EA 7 $500.00 $3,500.00 INLET PROTECTION EA 3 $200.00 $600.00 OUTLET PROTECTION EA 5 $200.00 $1,000.00 EC -2 & 3 DITCH PROTECTION LF 0 $10.00 $0.00 RIP -RAP LF 0 $55.00 $0.00 CHECK DAMS SQ.YD. 0 $30.00 $0.00 STREAM CROSSING TYPE I EA 0 $1,000.00 $0.00 STREAM CROSSING TYPE II EA 0 $3,000.00 $0.00 STREAM CROSSING TYPE III EA 0 $5,000.00 $0.00 PAVED CONSTRUCTION ENTRANCE EA 1 $2,000.00 $2,000.00 SUBTOTAL 43555.00 PROJECT MANAGEMENT LS 15% 6533.25 SUB - SUBTOTAL 50088.25 PROJECT ADMINISTRATION LS 10% 5008.83 TOTAL BOND AMOUNT REQUIRED 11 55097.08 heet last revised: 12-5-01