Loading...
HomeMy WebLinkAboutWPO200900026 Review Comments Bond Estimate 2009-07-24 (3)BOND ESTIMATE - EROSION CONTROL Spreadsheet last revised:12 -5 -01 PROJECT NAME: Old Trail Phase 8, Block 2 PROJECT NUMBER: WPO200900026 DATE OF ESTIMATE: 07/24/09 ESTIMATE BY: MRG BASED ON: Approved plan WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 2.29 1500 3435 SILT FENCE LF 550 5 2750 SAFETY FENCE LF 650 3 1950 TEMPORARY FILL DIVERSION LF 375 3 1125 DIVERSION DIKE LF 0 3 0 TEMPORARY SLOPE DRAIN LF 0 20 0 SEDIMENT TRAP 1 ACRES 0 1000 0 SEDIMENT BASIN 1 ACRES 19.6 1000 19600 CULVERT INLET PROTECTION EA 0 500 0 INLET PROTECTION EA 24 200 4800 OUTLET PROTECTION EA 2 200 400 EC -2 & 3 DITCH PROTECTION LF 0 10 0 RIP -RAP LF 0 55 0 CHECK DAMS SQ.YD. 0 30 0 PAVED CONSTRUCTION ENTRANCE EA 1 2000 2000 subtotal 36060.00 project management 5409.00 subtotal 41469.00 CONTINGENCY LS 10% 4146.90 TOTAL 45615.90 BOND AMOUNT REQUIRED 45700.00