Loading...
HomeMy WebLinkAboutWPO200900017 Review Comments Bond Estimate 2009-08-26 (3)PROJECT NAME: Walmart FILE #: WPO- 2009 -00017 DATE APPROVED: 26- Aug -09 Item Unit Amount Unit Cost Subtotal Filterra 46 each 3 $6,400.00 $19,200 Filterra 4x8 each 2 $6,900.00 $13,800 Filterra 6x6 each 0 $7,100.00 $0 Filterra 6x8 each 1 $9,500.00 $9,500 Filterra 6x10 each 0 $12,100.00 $0 Filterra 6x12 each 1 $14,200.00 $14,200 Filterra Installation per project 7 $14,175 Detention Risers, Manifold, etc. (from design engineer) $14,400 48" HDPE Detention Pipe linear foot 660.00 $96.00 $63,360 subtotal 148,635 project management $22,295 subtotal $170,930 10% Contingency $17,093 TOTAL $188,023 ROUNDED TOTAL $188,100 min total after reduction $37,620