Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO200900035 Review Comments Bond Estimate 2009-08-05
BOND ESTIMATE - EROSION CONTROL Spreadsheet last revised:12 -5 -01 PROJECT NAME: Meadow Creek Sanitary Sewer Interceptor, Contract C PROJECT NUMBER: WPO- 2009 -00035 DATE OF ESTIMATE: 07/31/09 ESTIMATE BY: PBC BASED ON: plans received 17 July 2009 WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 3.5 1500 5250 SILT FENCE LF 2720 5 13600 SAFETY FENCE LF 0 3 0 TEMPORARY FILL DIVERSION LF 0 3 0 DIVERSION DIKE LF 0 3 0 TEMPORARY SLOPE DRAIN LF 0 20 0 SEDIMENT TRAP 1 ACRES 0 1000 0 SEDIMENT BASIN 1 ACRES 0 1000 0 CULVERT INLET PROTECTION EA 0 500 0 INLET PROTECTION EA 0 200 0 OUTLET PROTECTION EA 0 200 0 EC -2 & 3 DITCH PROTECTION LF 0 10 0 RIP -RAP LF 0 55 0 CHECK DAMS SQ.YD. 0 30 0 PAVED CONSTRUCTION ENTRANCE EA 1 2000 2000 subtotal 20850.00 project management 3127.50 subtotal 23977.50 CONTINGENCY LS 10% 2397.75 TOTAL 26375.25 BOND AMOUNT REQUIRED 26400.00